My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:25:32 AM
Creation date
1/24/2020 11:10:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4707 Pacific Ave <br /> September 1997 <br /> Page 2 <br /> 32.26 feet bgs. Additionally, according to this quarterly report, in January 1997 the total depth of VW2 <br /> was 37.49 feet bgs and in July 1996 the total depth of VW2 was 39.27 feet bgs . A similar condition is <br /> noted for V W3 and V W4. It is entirely possible that the recoveries reported in the last vapor extraction <br /> system report may be related to the condition of the vapor extraction wells.A joint inspection by <br /> PHS/EHD and Unocal's representatives should be scheduled immediately to assess the condition of <br /> VW2. Given this recent evaluation of the vapor extraction system's well configuration, PHS/EHD <br /> hereby directs you to either include soil borings in the work plan which is due or to submit an addendum <br /> by October 16 1997,to assess the remedial progress achieved by the operating vapor extraction system. <br /> PHS/EHD requested previously that depth to water measurements be included on the analytical results <br /> summary table. Instead the groundwater elevation measurements are included. Since screened intervals <br /> have been measured from grade,dept to et s andeptheasier <br /> to water measurements that have beeto use for �son. <br /> Please update the analytical summary table w <br /> collected. <br /> The telephone messages,which were passed from PHS/EHD and yourself,between September 5, 1997 <br /> and September 11, 1997, indicated that you wished to have an extension for to September 12, 1997 date <br /> for submission of a work plan which was established by PHS/EHD in correspondence dated August 13, <br /> 1997. PHS/EHD informed you,via a phone message,that extensions of due dates are generally <br /> requested in writing. An extension will not be granted,PHS/EHD has directed Unocal to submit the <br /> work plan to install replacement wells since March 1996. PHS/EHD has not received the required work <br /> wells which may also include soil <br /> wells must be plan for the <br /> by Septembert29, 1997 t avoid further enforcement ngs /or air sparge <br /> actions. <br /> If you have any questions,comments or to schedule a field inspection,please contact me at(209)468-0337. <br /> Donna Heran,REHS, Director <br /> Environmental Health Division <br /> V <br /> Mary Meays, Senior REHS Margare Lagorto,REHS <br /> Supervisor <br /> Site Mitigation Unit <br /> cc: Elizabeth Thayer,Central Valley Regional Water Quality Control Board <br /> cc: David Irey, San Joaquin County Deputy District Attorney,Environmental Prosecutions Unit <br /> cc: Greg Gurss,GeoStrategies <br /> cc: Haig,Tejirian,MPDS <br />
The URL can be used to link to this page
Your browser does not support the video tag.