My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:25:32 AM
Creation date
1/24/2020 11:10:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARCH-PACIFIC INTERSEgTIFN IMPROVEMENTS <br /> P.O. Box 773, Stockton, A 9528 11: 22 <br /> (209) 464-4350 <br /> April 3, 1997 <br /> Mary Meays <br /> SJCo Environmental Health <br /> 304 E.Weber Ave. <br /> Stockton, CA 95202 <br /> Last year,the City of Stockton held two public meetings to discuss the background,plans, <br /> benefits,and expectations for major improvements of the March Lane-Pacific Avenue Intersection. <br /> Information given to the engineering design team by members of the public was very helpful in <br /> planning the improvements. <br /> Now,construction will begin. About mid-April, you will begin to see heavy construction <br /> equipment in the intersection. Work will generally take place between the hours of 8:o0 AM and <br /> 4:00 PM, and the construction team plans to minimize disruption during construction. Access to <br /> your homes and businesses near the intersection will be maintained throughout the project,but <br /> there may be some delays and inconvenience. Anticipated completion date is mid-September. <br /> The intersection will be reconstructed, and March Lane will be realigned to improve traffic <br /> flow. The City will also improve traffic signals and build new curb,gutter, sidewalk, and <br /> wheelchair ramps. <br /> Please join us at a public meeting on Thursday,April 10, at the Satellite City Hall, <br /> Community Meeting Room, in the Sherwood Mall(near Montgomery Ward). You are welcome to <br /> come any time between 4:00 PM and 6:00 PM to view the engineering design and talk with the <br /> construction engineers and city staff. About 4:30 PM and again at 5:30 PM,brief presentations <br /> will be made to review the construction plans and what you can expect to see in the intersection <br /> during the next few months. <br /> Feel free to call me on the Hotline at 464-4350 with any questions, or send a note to me at <br /> the address at the top of this page. <br /> Sincerely, <br /> Judith <br /> e <br /> Public Information Coordinator <br />
The URL can be used to link to this page
Your browser does not support the video tag.