Laserfiche WebLink
Work Plan For Soil Sampling-Tosco (Former Unocal)#6981, 4707 Pacific Avenue, Stockton, CA <br /> March 7, 2000 <br /> Task 5. Reporting and Office Operations <br /> Upon completion of all environmental activities and receipt of all data, GR will prepare a report <br /> documenting the sampling activities and analytical results. This report will be prepared for Tosco's <br /> use and distribution. <br /> PROJECT STAFF <br /> Mr. Stephen J. Carter, a Registered Geologist in the State of California(R.G.No. 5577), will provide <br /> technical oversight and review of the work. Mr. Greg Gurss, Senior Project Manager, will supervise <br /> implementation of field and office operations. GR employs a staff of geologists, engineers, and <br /> technicians who will assist with the project. <br /> If you have questions, please call us in Sacramento at(916)631-1300. <br /> Sincerely, <br /> G{eetttlleer�Ryann Inc. <br /> C \S�ERED GEO`O <br /> Michael F.Mitchener <br /> Project Geologist <br /> '4yt I No.5577 'k <br /> Stephen J. Carter <br /> Senior Geologist T'A OF CAtIFOP�! <br /> R.G. 5577 <br /> Attachments: Figure 1. Site Location Map <br /> Figure 2. Site Map <br /> GR Field Methods and Procedures <br /> Stockton,to#6981.WP1 4 <br />