Addendum to Work Plan For Soil Boring And Well Installation <br /> February 17, 1999 <br /> • Installation of Oxygen Releasing Compound proposed in the original GSI Work Plan will not be <br /> implemented until a later date, after the proposed wells have been installed and sampled, and the <br /> data analyzed. <br /> In addition to these proposed amendments to GSI's 1997 Work Plan,Tosco requested that well PTW-1 be <br /> included in the monitoring and sampling program for the subject site. Monitoring and sampling for the first <br /> quarter 1999 was performed on January 25 and 26, 1999,and included well PTW-1. Data will be included <br /> in GR's upcoming Quarterly Monitoring Report. Well PTW-1 will be monitored on a semiannual basis. <br /> The vapor extraction system (VES) installed at this site is not currently operating on a full-time basis. <br /> Influent vapor concentrations are too low for full-time operation. GR is currently "pulsing" the VES, <br /> operating it for a period of only several days once or twice a month. While pulsing the VES during the first <br /> quarter 1999, GR will collect field measurement to evaluate the VES radius of influence. This evaluation <br /> will be included in the First Quarter 1999 VES Report. <br /> This proposed scope of work can be implemented 2 to 4 weeks after receipt of written approval from <br /> SJCPHS-EHD, depending on driller availability. If you have comments or questions,please call us in our <br /> Sacramento office at 916.631.1300. <br /> Sincerely, S�EREC GEp�p <br /> Gettler-Ryan Inc. � J./k�/ <br /> y <br /> No.5577 <br /> Stephen J. Carter CP <br /> Senior Geologist <br /> R.G. 5577 OF CAI�F�P�` <br /> Greg A. Gurss <br /> Senior Project Manager <br /> Attachments: Figure 1. Vicinity Map <br /> Figure 2. Site Plan <br /> Figure 3. Proposed Air Sparge Well Construction Detail <br /> Figure 4. Proposed Shallow Well Construction Detail <br /> 140124.04 3 <br />