Laserfiche WebLink
_ Site Safety Plan December 4, 1989 <br /> Unocal Station No. 6981, Stockton, California AGS 38032-3S <br /> The Staff Geologist or Engineer will also act as the Site Safety Officer. As such, the Staff <br /> Geologist or Engineer is responsible for addressing the following items: . <br /> o Implementing the Site Safety Plan, Company policy, and procedures <br /> o Requiring and maintaining adequate safety supplies and equipment inventory <br /> onsite <br /> t o Conducting daily safety meetings and advising workers regarding hazards <br /> o Site control, decontamination, and contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> r=� The Staff Geologist or Engineer has the authority to suspend work any time he or she finds <br /> that the provisions of the Plan are inadequate for worker safety. The Staff Geologist or <br /> Engineer will inform the Project Manager and the Health and Safety Coordinator promptly <br /> of deficiencies within the Plan or individuals or subcontractors whose conduct is not <br /> consistent with the requirements of this Plan. <br /> MEDICAL SURVEILLANCE <br /> Applied GeoSystems personnel and subcontractors engaged in project activities must <br /> participate in a medical surveillance program and must be cleared by the examining <br /> physician(s) to wear respiratory protection devices and protecti7.•e clothing for working with <br /> hazardous materials. The applicable requirements of Title 8,Section 5216, of the California <br /> Administrative Code will be observed. The applicable requirements under 29 CFR <br /> 1910.120 of the Federal Adm nistrative Code will also be observed. <br /> SAFETY AND ORIENTATION MEETING <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a project- <br /> specific training meeting for safety issues and review the project tasks before beg, nning <br /> work. The meeting will be led by the Project Manager or Staff Geologist or Engineer. In <br /> addition, fit-testing of respiratory protective devices will be conducted as part of the safety . <br /> orientation meeting when the use of a respirator may be required. <br /> �i <br /> 2 <br /> pp mac' 41200Sy AMS <br />