My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012046
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 1:01:44 PM
Creation date
1/24/2020 11:26:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012046
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> December 16, 1992 ���� <br /> Unocal Service Station No 6981, Stockton, California Working To Restore Nature <br /> I <br /> Vapor-F traction Well Installation <br /> our va or-extraction- wells (VW-1 through VW-4) were installed in Four borings near t4d' <br /> stank c6rnplel— d-disptns-e- 1sTan_s (Plate 2) These wells were used to conduct a vapor- <br /> extractlon test (discussed in Vapor-Extraction Test section) Details on the construction of <br /> the vapor-extraction wells are summarized in Table 2 and are shown on the Logs of Borings <br /> (Appendix B) <br /> Assessment of Ground Water <br /> Ground-Water Monitoring Well Construction <br /> ro delineate the extent of dissolved hydrocarbons in ground yvater. eight gr_ouxid-water? <br /> O l monttoting wells (MW-1 through MW-B) were installed onsite and five .ground-wafer <br /> monitoring wells were installed offsite (MW-9 through MW--M (Jrne onsrte boring was 7 <br /> (converted to a pumping test well (PTW-1)1 Monitoring wells MW-1 through MW-5 were <br /> installed in January and February 1990 MW-6 through MW-8 were installed in March 1992 <br /> and MW-9 through MW-13 and PTW-1 were installed in August 1992 Details on the <br /> construction of the wells are summarized in Table 2 and are shown on the Logs of Borings <br /> (Appendix B) <br /> Before ground-water monitoring wells MW-10, MW-11, and MW-12 were installed, the <br /> borings were drilled to dust above ground water and a Hydropunch sampling device was <br /> driven into the saturated sediments Ground-water samples were collected with the <br />! Hydropunch and analyzed for hydrocarbons prior to the completion of the wells Because <br /> dissolved hydrocarbon concentrations were below the laboratory's limits of detection for all <br /> petroleum analytes, the borings were completed as monitoring wells to establish a"zero-line" <br /> for the dissolved hydrocarbon plume <br /> • <br /> 38032-10 6 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.