Laserfiche WebLink
June 30, 1992 <br /> Unocal Station No 6981, Stockton, California <br /> 1.3 Observe drilling of one 12-inch-diameter soil boring onsite to approximately <br /> 75 feet below surface grade and construction of a 6-inch-diameter pumping- <br /> test well the boring The proposed location of the boring is shown ojV <br /> 1.4 Develop the four monitoring wells and one pumping-test well <br /> 15 Analyze soil samples from the borings, as necessary, for TPHg using EPA <br /> Method 8015 with EPA extraction Method 5030 and for BTEX using EPA <br /> Method 8020 in a laboratory certified by the State of California. <br /> 16 Contract with a licensed surveyor to survey the four monitoring wells and <br /> pumping-test well with respect to mean sea level. This data will be used to <br /> evaluate the ground-water flow direction and gradient beneath the site <br /> TASK-2; Evaluation of Aquifer Characteristics <br /> 21 Perform a step-drawdown pumping test to evaluate a pumping rate and well <br /> efficiency for the 24-hour pumping test Conduct a 24-hour pumping test with <br /> 6-hour recovery at the site using the 6-inch-diameter well as the pumping well <br /> Collect three water samples from the pumping test well for laboratory <br /> analyses <br /> 22 Submit three water samples from the pumping test well for analyses for TPHg <br /> using EPA Method 8015 with EPA extraction Method 5030 and for BTEX <br /> using EPA Method 602. In addition, three water samples will be analyzed for <br /> total dissolved solids, common ions and cations, alkalinity, and bacteria. <br /> 23 Interpret pumping-test data and other hydrogeological data to evaluate the <br /> transmissivity and storativnty of the water-table aquifer, and estimate the <br /> theoretical capture radius and long-term pumping rate. We will discuss our <br /> interpretation of the data with Unocal and make recommendations <br /> TASK 3: Preparation of Problem Assessment Report <br /> 3.1 Prepare a PAR after the lateral extent of residual gasoline hydrocarbons in <br /> ground water has been delineated The PAR will include the results of the <br /> pumping test. <br /> W32- <br /> 3so3z-il <br /> 7 6 <br />