My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012083
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 12:42:41 PM
Creation date
1/24/2020 11:38:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012083
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> �ArA ■ruAM <br /> /` �A <br /> Working to Restore Nature <br /> catalytic oxidizer A 400 cfm extraction blower is planned, however, a blower of less than <br /> 400 cfm may be substituted <br /> The granular activated carbon system will utilize carbon steel canisters, 88" in height and <br /> 48" in width, each bearing a load of 2000 lbs of vapor phase carbon The maximum <br /> throughput for the canister is 500 CFM The canisters model V2000, will be supplied by <br /> Bameby & Sutcliffe Two canisters will be plumbed in series The blower rates, VOC <br /> concentrations and residence time will be limited so that the first canister will reduce VOC <br /> concentrations to approximately I ppmv A breakthrough criteria defined at 2% LEL <br /> effluent concentration at the first canister provides for acceptable loading of the first <br /> canister while avoiding increased effluent at the system stack <br /> At an influent concentration of 400 ppmv at 400 CFM, the calculated VOC load in the first <br /> canister is 51 lbs/day This produces a calculated time to loading of 7 days The system will <br /> be monitored at a frequency of two times the loading rate When loading becomes <br /> apparent, the effluent from the second canister will be allowed to increase to the limit set <br /> in the authority to construct to allow for maximum loading of the carbon When the limit <br /> is reached, the carbon will be removed by the supplier and replaced <br /> A regenerative blower, not to exceed 400 CFM at 2 inches of Hg, will be used to pull vapors <br /> from the wells and through the carbon canisters It will be placed downstream of the carbon <br /> canisters to prevent escape of VOC's in the event of a line separation and to avoid <br /> compression heat transfer to the carbon <br /> Operating Schedule <br /> During the initial "shakedown" period, the system will be operated between 8 a m and 5 <br /> p m , Monday through Friday When stable operation is achieved, the system will operate <br /> on a 24 hr/day, 7 days/week basis It is expected that the soil clean-up operation will last <br /> less than 3 years <br /> Expected Emission of Air Contaminants <br /> Phase 1 <br /> Fresh air will be mixed with the soil-gas stream as needed by the automatic dilution system <br /> All calculations of energy consumption and emissions are based upon the maximum 200 <br /> scfm rates Inlet concentrations are calculated from samples collected during a vapor <br /> extraction pilot test Gas samples were analyzed at a state certified laboratory for Total <br /> Petroleum Hydrocarbons as gasoline (TPHg) and BTEX <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.