My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012083
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 12:42:41 PM
Creation date
1/24/2020 11:38:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012083
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ArNZA�N WArwa <br /> Working to Restore Nature <br /> ATC Application <br /> Unocal Station No 6981 <br /> 4707 Pacific Avenue <br /> Stockton, California <br /> Page Five <br /> CALCULATIONS <br /> Phase 1 <br /> Inlet Temp = 80°F (ambient) <br /> Maximum Oxidation Temperature = 1450°F <br /> MATERIAL ENTERING AND LEAVING EQUIPMENT <br /> Maximum air flow rate at 200 scfm <br /> 20� 0 ft-3) 60min 0 075 IN = 900 lb air <br /> min hr ft3 hr <br /> Fuel Requirements <br /> Raise air temperature from 100° to 1450° <br /> Heat capacity of air = 24 BTU/°F lb <br /> Density of air = 0 75 Ib/ft3 <br /> Air flow rate = 200 SCFM <br /> 200 ft3 60 min 0( 75__I_h) (24 BTU) (1450 - 100°F = 291,600 BTU <br /> min hr ft3 Ib OF hr <br /> Heating value of natural gas = 1000 BTU/ft3 <br /> (291,600 BTU) ( 1 ft' hr = <br /> hr 1000 BTU 60 min <br /> = <br /> 49 ft3/min = Net Fuel Combustion Products <br /> Extracted Air = 200 SCFM <br /> Combustion Blower = 100 SCFM <br /> Excess combustion air = 100 SCFM + 4 9 SCFM = 104 9 SCFM <br /> Total Outlet gas flow rate = 104 9 SCFM + 200 SCFM = 304 9 SCFM <br />
The URL can be used to link to this page
Your browser does not support the video tag.