My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012184
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 12:51:51 PM
Creation date
1/24/2020 11:55:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012184
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ary <br /> 6ETTLER. - RYAN INC. <br /> February 24, 2000 <br /> G-R Job#180138 <br /> Mr Edward C Ralston <br /> Tosco Marketing Company <br /> 1380 Lead Hill Road, Suite 120 <br /> Roseville, California 95661 <br /> RE First Quarter 2000 Groundwater Monitoring& Sampling Report <br /> Tosco(Unocal) Service Station#6981 <br /> 4707 Pacific Avenue <br /> Stockton, California <br /> Dear Mr Ralston <br /> This report documents the quarterly groundwater monitoring and sampling event performed by Gettler-Ryan Inc <br /> (G-R) On January 27 and 28, 2000,field personnel monitored eighteen wells (MW-1,MW-2,MW-4 through <br /> MW-9,MW-11,MW-14,MW-15,MW-16,VW-1 through VW-4,VW-7,and PTW-1)and sampled seventeen <br /> wells(MW-1,MW-2,MW4 through MW-9,MW-11,MW-14,MW-15,MW-16,VW-1,VW-3,VW-4,VW-7, <br /> and PTW-1) at the above referenced site One well (VW-2) was dry <br /> Static groundwater levels were measured and all wells were checked for the presence of separate-phase <br /> ihydrocarbons Separate-phase hydrocarbons were not present in the wells Static water level data and <br /> groundwater elevations are summarized in Table 1 A Potentiometnc Map is included as Figure 1 <br /> Groundwater samples were collected from the monitoring wells as specified by G-R Standard Operating <br /> Procedure - Groundwater Sampling (attached) The field data sheets are also attached The samples were <br /> analyzed by Sequoia Analytical Analytical results are summarized in Tables 1, 2 and 3 A Concentration Map <br /> is included as Figure 2 The chain of custody document and laboratory analytical reports are also attached <br /> Sincerely, <br /> Deanna L Harding <br /> Project Coordinator y ty <br /> NO.5W <br /> Stephen J Carter , <br /> Semor Geologist,R G No 5 577 OF C FIFO <br /> Figure 1 Potentiometnc Map <br /> Figure 2 Concentration Map <br /> Table 1 Groundwater Monitoring Data and Analytical Results <br /> . Table 2 Groundwater Analytical Results-Oxygenate Compounds <br /> Table 3 Groundwater Analytical Results <br /> Attachments Standard Operating Procedure-Groundwater Sampling <br /> Field Data Sheets <br /> ml jqw Chain of Custody Document and Laboratory Analytical Reports <br /> 6747 Sierra Court , Suite J • Dublin , California 94568 ( 925) 551 - 7555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.