My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012186
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 12:56:39 PM
Creation date
1/24/2020 11:56:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012186
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD OPERATING PROCEDURE - <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Prior to sample collection, the type <br /> of analysis to be performed is determined Loss prevention of volatile compounds is controlled and <br /> sample preservation for subsequent analysis is maintained <br /> Prior to sampling,the presence or absence of free-phase hydrocarbons is determined using a MMC flexi- <br /> dip interface probe Product thickness,if present, is measured to the nearest 0 01 foot and is noted in the <br /> field notes In addition, static water level measurements are collected with the interface probe and are <br /> also recorded in the field notes <br /> After water levels are collected and prior to sampling, temperature, pH and electrical conductivity are <br /> measured If purging is to occur, each well is purged a minimum of three well casing volumes of water <br /> using pre-cleaned pumps (stack, suction, Grundfos), or polyvinyl chloride bailers The measurements <br /> are taken a minimum of three times during the purging Purging continues until these parameters <br /> stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred from the <br /> bailer into appropriate containers Pre-preserved containers,supplied by analytical laboratories,are used <br /> when possible When pre-preserved containers are not available,the laboratory is instructed to preserve <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality assurance/quality control standards The samples are labeled to include the job number,sample <br /> identification,collection date and time,analysis,preservation(if any),and the sample collector's initials <br /> The water samples are placed in a cooler, maintained at 4oC for transport to the laboratory Once <br /> collected in the field,all samples are maintained under chain of custody until delivered to the laboratory <br /> The chain of custody document includes the job number,type of preservation,if any,analysis requested, <br /> sample identification,date and time collected, and the sample collector's name The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br /> i <br /> A laboratory supplied trip blank accompanies each sampling set For sampling sets greater than 20 <br /> samples, 5%trip blanks are included The trip blank is analyzed for some or all of the same compounds <br /> as the groundwater samples <br /> As requested by Tosco Marketing Company,the purge water and decontamination water generated during <br /> sampling activities is transported to Tosco- San Francisco Area Refinery, located in Rodeo, California <br /> Wormsltosco-sop frm-1198 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.