My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012225
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 1:04:41 PM
Creation date
1/24/2020 12:18:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012225
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> S E C ® R <br /> r 1E <br /> 1� <br /> • <br /> Groundwater has been monitored on a quarterly basis since 1990 and sampled at the site on a <br /> quarterly or semi-annual basis since April 1993 Floating product or sheen has never been observed <br /> in any of the wells Historically, petroleum hydrocarbon concentrations in the groundwater have <br /> ranged from not detected to 78,000 parts per billion (ppb) of TPHg (well VW-2), not detected to <br /> 28,000 ppb of benzene (well MW-5), and not detected to 4,900 ppb of MtBE (well VW-3) <br /> Groundwater data for the third quarter 2001 sampling event on September 12 and 13, 2001 ranged r <br /> from not detected to 34,000 parts per billion (ppb) of TPHg (well VW-7), not detected to 870 ppb ofl <br /> benzene (well VW-7), and not detected to 310 ppb of MtBE (well VW-4) Historically, depth to <br /> groundwater has risen from approximately 51 to 53 feet bgs in 1993 to 30 to 32 feet bgs in ' <br /> Y <br /> September 2001 Groundwater flow has been to the northeast with the hydraulic gradient ranging <br /> from 0 002 to 0 013 feet/feet Ato <br /> In November 2001 Gettler Ryan install ten ozone wells SP-1 through SP-10 to approximately 65 feet <br /> bgs and three ozone wells SP-11 through SP-13 were installed to approximately 40 feet bgs The <br /> well were connected to an ozone sparge system and the system was placed into operation on <br /> December 19, 2001 The system cycles ozone/air injection between ten sparge points (SP-1 <br /> through SPA 0) Since the ozone microsparge panel can only supply ten points, wells SPA 1 through <br /> SP-13 will be for future use The schedule is currently set to cycle through each point 16 times per <br /> day, for 5 to 10 minutes per point per cycle Sparge point selection and cycle times will be adjusted <br /> as petroleum hydrocarbon concentrations in groundwater change <br /> RECENT QUARTER ACTIVITIES (Third Quarter 2003) <br /> 1 Performed quarterly groundwater monitoring and sampling (GRI) <br /> 2 Prepared and submitted a quarterly summary report <br /> 3 Performed remedial system operation and maintenance <br /> a <br /> NEXT QUARTER ACTIVITIES (Fourth Quarter 2003) <br /> 1 Prepare and submit a quarterly summary report <br /> 2 Perform quarterly groundwater monitoring and sampling , <br /> 3 Perform remedial system operation and maintenance <br /> a <br /> CHARACTERIZATIONIREMEDIAL STATUS <br /> Sod contamination delineated? Yes <br /> Dissolved groundwater delineated? Yes <br /> Free product delineated? NA I <br /> Sodlgroundwater remediation in progress? Yes <br /> Start? 2001 <br /> Anticipated completion date? 2005 <br /> r <br /> r <br /> CONSULTANT SECOR International Incorporated <br /> r <br /> ,l <br /> �+e <br /> a� <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.