My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 1:10:49 PM
Creation date
1/24/2020 12:19:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012226
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Ozone Microsparge System Annual Status Report—Former 76 Station No 6981,Stockton,California <br /> September 2 2003 ` <br /> MW-16 as 31 ppb This is a decrease of 88% since the system began operation The MtBE <br /> concentration in VW-7 was reported as 33 ppb on December 12, 2001,,and <20 ppb on July 22, , <br /> 2003 MtBE has not been detected since July 2002 (detection limits have varied from 2 5 ppb to <br /> V <br /> 100 ppb) in W-7 suggesting that MtBE is no longer present irf VW-7, which represents a greater, <br /> than 84% decrease in MtBE Historically, MtBE concentrations from the initial groundwater <br /> sampling events (8/21/99) to the most recent sampling event (7/22/03) have decreased by 55% in <br /> well MW46 and by over 96% in well VW-7 Additionally, maximum MtBE concentrations have <br /> ` decreased from 250 ppb`to 31 ppb m well MW-16, and from 510 ppb to <20 ppb in well VW-7 <br /> > i <br /> DISCUSSION OF RESULTS <br /> r , <br /> The ozone treatment appears to be effective at decreasing TPHg and benzene concentrations in <br /> groundwater 3 Over the evaluation period, concentrations decreased by,85% (TPHg) and 79% <br /> (benzene) m4VW-7 In addition, MtBE no longer appears to be present in VW-7 as it has not been <br /> detected since July 2002 TPHg, benzene, and MtBE have all decreased in MW-16 since the <br /> system began, however low concentratibns of MtBE have fluctuated-during the reporting period <br /> and did not decfease over the previous 7 months <br /> The,other onsite wells have demonstrated similar downward trends during the last seven months of <br /> µ . treatment Wells MW-1, MW-4 through MW-9, VW-1, VW-3, and PTW-1 have remained below <br /> detection limits for TPHg, benzene, and MtBE Well MW-2 has shown a decrease of 90%, 98%, <br /> and 61% for TPHg, benzene, and MtBE, respectively, and well MW-11 has shown a greater than <br /> 88%decrease for MtBE during the reporting period <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> The results of the concentration versus time charts show that hydrocarbon concentrations have u <br /> generally declined or remained stable with some small increases during the past seven months of <br /> remedial system operation The ozone sparge system has been successful in reducing petroleum <br /> concentrations in the groundwater at this site This includes TPHg and benzene, which are the <br /> compounds of primaryconcern, as well as MtBE y <br /> r <br /> " <br /> The current ozone injection addresses the dissolved impact onsite and also acts -as a barrier to y <br /> mitigate any continuing migration of dissolved hydrocarbons offsite Treatment directly offsite is <br /> not,feasible due to the proximity of Pacific Avenue, however the offsite well MW-15 will continue <br /> to be monitored to determine plume stability _ <br /> t <br /> The ozone microsparge system will continue to operate for at Ieast the next six months; and <br /> monitoring wells MW-16 and VW-7 will continue to be sampled on a monthly basis A ` <br /> semi-annual status report will be prepared and submitted after the next six months of operation <br /> • 140124 08 _ <br /> 5 k <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.