Laserfiche WebLink
�r <br /> QUARTERLY SUMMARY REPORT <br /> SECOND QUARTER-2003 <br /> (April-June) <br /> rico (76) Service Station No 6981 <br /> 4707 Pacific Ave <br /> Stockton, CA <br /> COUNTY: San Joaquin RWQCB Office Central Valley Region,Sacramento Branch <br /> BACKGROUND The USTs were replaced in 1988 To date 16 onsite and 5 offsite borings have been drilled and 13 <br /> groundwater monitoring wells,one pumping test well,and six vapor extraction wells installed 1,600 cubic yards(cy3)of soil <br /> were excavated and aerated Groundwater monitoring began in February 1990 Vapor Extraction Test was performed in March <br /> 1992 A pump was test was performed in August 1992 A Vapor Extraction System(VES)was installed and operation initiated <br /> in September 1994 Wells MW-3, MW-10, MW-12, and MW-13 were abandoned to facilitate re-construction of street <br /> intersection. Submitted work plan to install one offsite groundwater monitoring well and drill one soil bormg in September <br /> 1997 Submitted Work Plan Addendum (dated 2117199) for additional bormgslwells Submitted additional subsurface <br /> investigation (borings/wells)report date 11/15/99 USTs and product piping removed and samples collected in April 2000 <br /> Approximately 100 cy3 of soil were over-excavated from the product piping/dispenser areas Submitted UST/line removal and <br /> sampling report(dated 8129100) Pulsing of the VES was initiated in November 1998 VES has not operated since Apnl 2000 <br /> (UST removal and electrical service rerouted, blower failure) An ozone microsparge system was installed in 2001 and <br /> commenced operation in December of 2001 <br /> RECENT QUARTER ACTIVITIES: Monitored and sampled groundwater monitonng wells Prepared and submitted the <br /> quarterly summary report Collected operational progress samples from the ozone sparge system <br /> NEXT QUARTER ACTIVITIES Monitor and sample groundwater monitoring wells Prepare and submit a quarterly <br /> summary report Collect operational progress samples from the ozone sparge system <br /> OHARACTERIZATIONWMEDIAL STATUS <br /> Soil contamination delmeated9 <br /> Dissolved groundwater delmeated9 yes <br /> Free product delmeated9 n/a <br /> Amount of hydrocarbon contaminant recovered <br /> this quarter/total9 0/14,977' (lbs) <br /> Soil remediation in progress? 'Les <br /> anticipated start? 9194 <br /> anticipated completion? unknownl <br /> Dissolved/free product remediation <br /> in progress? Yes, ozone microsparge for dissolved <br /> hydrocarbons <br /> anticipated start? 12/19/01 <br /> anticipated completion`s unknown <br /> 1 Approximately 14,794 pounds of TPHg and 183 pounds of benzene have been extracted through 3Q02 <br /> 140124 qsr <br />