Laserfiche WebLink
QUARTERLY SUMMARY REPORT <br /> FIRST QUARTER- 2003 <br /> (January—March) <br /> CONCLUSIONS Soil and groundwater impact have been delineated The VE remedial system has been successful in <br /> removing a large mass of petroleum hydrocarbons from the soil The ozone remedial system 1s currently in operation to treat <br /> dissolved hydrocarbons in the groundwater and has been successful in reducing petroleum concentrations in the groundwater at <br /> this site <br /> RECOMMENDATIONS GR recommends continuing the quarterly groundwater monitoring and sampling program Ozone <br /> effectiveness sampling should also be continued on a monthly basis <br /> CONSULTANT/CONTRACTOR Gettler-Ryan Inc <br /> r <br /> 140124 qsr 2 <br />