Laserfiche WebLink
QUARTERLY SUMMARY REPORT <br /> THIRD QUARTER -2002 <br /> (July - September) <br /> CONCLUSIONS: Soil and groundwater impact has been delineated The VE remedial system has been successful in <br /> removing a large mass of petroleum hydrocarbons from the soil The ozone remedial system is currently in operation to treat <br /> dissolved hydrocarbons in the groundwater <br /> RECCOMENDATIONS GR recommends continuing the quarterly groundwater monitoring and sampling program Ozone <br /> effectiveness sampling should also be continued on a monthly basis <br /> CONSULTANT/CONTRACTOR- Gettler-Ryan Inc_ <br /> i <br /> • <br /> 140124 qst 2 <br />