Laserfiche WebLink
hydrocarbons calculated as gasoline (TPHg) and 183 pounds of benzene has been extracted and <br /> treated <br /> During the first quarter 2003 a carbon absorption system was installed to treat off-gas During the <br /> third quarter 2003 the SVE system was operated continuously from August 12 through September <br /> 18, 2004 Based on FID readings collected during SVE system O&M, approximately 12 lbs of <br /> petroleum hydrocarbons were removed during the quarter The initial influent concentration was 18 <br /> ppmv on August 12, but was quickly reduced to non-detectable levels of petroleum hydrocarbons <br /> Based on the results of the third quarter 2004 data (both groundwater monitoring and remediation ' <br /> system operational data) ozone sparging continues to be effective in reducing petroleum <br /> hydrocarbon concentrations Dissolved MTBE and other hydrocarbon levels have declined over <br /> time since ozone sparge system startup in 2001 (1 a as shown in Figures B-1 and B-2, <br /> Attachment B) <br /> Continued pulsing of the existing SVE system is no longer a cost effective remedial technology <br /> based on no detectable petroleum hydrocarbons in the system influent <br /> San Joaquin County Environmental Health Department approved the remove the SVE system in <br /> their letter dated January 12, 2005 <br /> CHARACTERIZATION STATUS <br /> Contamination in sod and groundwater has been adequately delineated <br /> RECENT SUBMITTALS/CORRESPONDENCE <br /> • January 12, 2005 - SJCEHD letter approves SVE system removal and requires repair of well <br /> MW-11 <br /> THIS QUARTER ACTIVITIES(Fourth Quarter 2004) <br /> 1 Performed quarterly groundwater monitoring and sampling (TRC) <br /> 2 Prepared and submitted a quarterly summary report <br /> 3 Performed remedial system O&M <br /> NEXT QUARTER ACTIVITIES (First Quarter 2005) <br /> I <br /> 1 Prepare and submit a quarterly summary report <br /> 2 Perform quarterly groundwater monitoring and sampling <br /> 3 Perform remedial system O&M <br /> 4 Remove the existing SVE system <br />