My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012855
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012855
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 1:17:00 PM
Creation date
1/24/2020 12:36:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012855
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> f T r <br /> Ozone Microsparge Well and System Installation Report—Former Tosco(Unocal)Service Station No 6981 <br /> February 1,2002 <br /> I <br /> s• <br /> Thirteen ozone sparge points were installed at locations shown on Figure 2 The bonngs were drilled <br /> to depths of approximately 65 feet bgs (SP-1 through SP-10) and 40 feet bgs (SP-11 through SP-13) <br /> °A sparge point was installed at the bottom of each boring Sparge point construction details are <br /> presented on the boring logs in Appendix B <br /> 'The ozone panel was mounted on a unistrut frame The panel includes an ozone generator, air <br /> compressor,and a programmable timer/controller `Sparge points are connected to the panel by 318" <br /> LDPE tubing Each sparge point has a dedicated line The tubing was run through schedule 80 PVC <br /> conveyance piping for added protection Construction activities were performed by Glennco of <br /> Newcastle, California The process flow diagram_is included as Figure 3 <br /> Ozone Microsparge Siem Startup <br /> The system was placed into operation on December 19, 2001 The'system cycles ozone/air injection <br /> between ten sparge points (SP-J through SP-10) Since the ozone microsparge panel can only supply <br /> ten points, wells SP-11 through SP-13 will be for future use The schedule is currently set to cycle <br /> through each point 16 times per day, for 5 to 10 minutes per point per cycle Sparge point selection <br /> and cycle times will be adjusted as petroleum hydrocarbon concentrations in groundwater change A <br /> system status report will be issued after the first six months of operation, presenting the results of the <br /> sampling program At that time,the effectiveness of the system will be evaluated <br /> • SUMMARY - <br /> Thirteen ozone microsparge wells (SP-1 through SP-13) were installed on-site as an enhancement to <br /> the existing remediation system in November 2001 Drill cuttings generated during drilling activities <br /> were sampled, then transported to Forward Landfill for disposal The ozone microsparge system was <br /> placed into operation on December 19, 2001 The vapor extraction system modifications will be <br /> installed and the system operation initiated upon receipt of the specified new equipment <br /> DISTRIBUTION <br /> GR recommends that a copy of this report be forwarded to Ms Margaret Lagorio of SJCPHS-EHD at <br /> 304 East Weber Avenue, Third Floor, Stockton, California 95202 and Mr David Luick of Dayton <br /> Hudson Corporation-Target at P O Box 9411, Minneapolis,Minnesota 55440 <br /> f <br /> REFERENCES <br /> Gettler-Ryan Inc, 2001, Groundwater Monitoring and Sampling Report Third Quarter Event, Report <br /> No 180138,dated October 24, 2001 <br /> 14012412 <br />' S <br />
The URL can be used to link to this page
Your browser does not support the video tag.