My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
17750
>
2900 - Site Mitigation Program
>
PR0501477
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:22 AM
Creation date
1/24/2020 2:15:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0501477
PE
2965
FACILITY_ID
FA0005116
FACILITY_NAME
SMS BRINERS INC
STREET_NUMBER
17750
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
18314010
CURRENT_STATUS
01
SITE_LOCATION
17750 E HWY 4
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q SEP 05 'Sy 13:41 LUHDVRFF--CRLMRNINI WOODLAND P.3/10 <br /> %./ <br /> TABLE OF CONTENTS <br /> Page <br /> I. INTRODUCTION I <br /> If. INNT'ERIM GROUND-WATER MONITORING 3 <br /> Monitoring Network 3 <br /> Monitoring Program 4 <br /> Water Level Measurements 5 <br /> Ground-Water Quality 5 <br /> Surface Water Quality 6 <br /> III. INVESTIGATION FINDINGS 8 <br /> Surface Water Hydrology g <br /> Site Geologic Conditions 10 <br /> Ground-Water Levels and Gradients 10 <br /> Aquifer Characteristics 12 <br /> Ground-Water Quality 14 <br /> Extent of Saline Water Migration 17 <br /> Surface Water Quality 18 <br /> IV. PROPOSED PLANT REVISIONS AND ELIMINATION OF <br /> EVAPORATION PONDS 20 <br /> Waste Brine Characterization 21 <br /> Plant Revisions 21 <br /> Phase I - Brine Tankage, Drainage, and Recycling 23 <br /> Phase II - Surface Drainage 24 <br /> Phase III - South Pond Closure 24 <br /> Phase IV - North Pond Closure 25 <br /> V. MONITORING PROGRAM AND NETWORK--INTERIM <br /> VERIFICATION MONITORING 26 <br /> Additional Monitoring Facilities 26 <br /> Investigation of Existing Facilities 28 <br /> Verification Monitoring Network 29 <br /> Verification Monitoring Program 30 <br /> Ground-Water Level Measurement 30 <br /> Sampling Protocol 30 <br /> Quality Assurance/Quality Control 32 <br /> Data Evaluation 33 <br /> Reporting 35 <br /> VI. SUMMARY 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.