Laserfiche WebLink
STATE OF CALIFORNIA `- GEORGE DEUKMEJIAN,Governor <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD- <br /> CENTRAL VALLEY REGION <br /> 3201 5 STREET <br /> SACRAMENTO,CALIFORNIA 95816-7090 <br /> PHONE: (916)445.0270 <br /> �4P sTd <br /> LNViR�lT/SERV CESTH <br /> 3 September 1985 FER <br /> Mr. Joseph Scalmanini <br /> Luhdorff and Scalmanini Consulting Engineers <br /> 601 Court Street <br /> Woodland, CA 95695 <br /> GROUND WATER MONITORING, SMS BRINERS, SAN JOAQUIN COUNTY <br /> Enclosed are comments on the 15 May 1985 ground water monitoring proposal and a <br /> summary of our 23 July 1985 meeting. As discussed, the following modifications <br /> will be made to the proposed plan: <br /> 1. Well P4 will be included in the ground water monitoring network. <br /> 2. The new monitoring well will be located as close as practical to the east - <br /> west centerline of the ponds. <br /> 3. Existing well P5 must be qualified before a determination can be made on <br /> Its usefulness as a monitor well . <br /> Interi /tatus of the Briner's ponds and ground water monitoring program will be <br /> revie ed in 12=18 months. If you have any questions, please call me at (916) <br /> 323- 05. <br /> !v � <br /> RICHARD Z EDO <br /> Area Engineer <br /> RGA:jec <br /> Enclosure <br /> RECEIVED <br /> SEP 5 1985 <br /> WHIDORK&SCA ANINt <br /> CONSULTING E14GEERS <br />