My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
13170
>
2900 - Site Mitigation Program
>
PR0505432
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 3:08:30 PM
Creation date
1/24/2020 2:34:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0505432
PE
2960
FACILITY_ID
FA0006779
FACILITY_NAME
DIVIDEND PROPERTY
STREET_NUMBER
13170
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
13170 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dividend Development Corporation October 23, 1991 <br /> Addendum Remediation Workplan, Page 6 <br /> Biotreatment of the. contaminated soils is expected to proceed over <br /> a duration of four (4) to six (6) months. Biotreatment progress <br /> shall be periodically monitored by analyzing representative samples <br /> from the treated soil for Total Petroleum Hydrocarbon (TPH) content <br /> using EPA Test Method- 418. 1. . - <br /> In <br /> ethod418. 1. .In addition to periodic progress analysis or soils, approximately <br /> eight (8) to twelve (12) representative confirmatory soil samples <br /> shall be analyzed from the biotreated' soils prior to cessation of <br /> biotreatment operations. These soil samples shall be analyzed <br /> using both EPA Test Methods 418. 1 (TPH) and 8020 (BTXE) . <br /> j <br /> CLOSING COMMENTS: <br /> TTI hopes that the aforementioned additiones to the workplan are <br /> agreeable to the RWQCB.. If any .questions arise, , please contact <br /> Adam Zipp, Ph.D. - at 114/668-1669. <br /> The memorandum from . Mr. Higgins mentioned the eventual intent of <br /> the RWQCB to question Santa Fe Pacific Pipeline Partners LTD about <br /> the possible petroleum,hydrocarbon- contamination coming from their <br /> _property, which is located hydrologically up-gradient from Tracy <br /> North. This action is supported. <br /> Sincerely, <br /> Toxic Techno-logy, Inc. <br /> Adam P. Zip , Ph. D. <br /> Chairman <br /> JF/cjt <br /> Enclosure <br /> cc: Mike Higgins <br /> RWQCB <br /> j <br /> Toxic Technology, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.