My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
13880
>
2900 - Site Mitigation Program
>
PR0508216
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 3:26:24 PM
Creation date
1/24/2020 3:16:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508216
PE
2960
FACILITY_ID
FA0007997
FACILITY_NAME
MANSFIELD PROPERTY
STREET_NUMBER
13880
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20927030
CURRENT_STATUS
02
SITE_LOCATION
13880 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHEVRON EMC "058420213 09/19 '00 "-58 N0.075 04/10 <br /> Chevron <br /> Chevron <br /> Chevron Environmental Management <br /> September 7, 2000 Company <br /> 6001'Bollinger Canyon Road <br /> P.0.Box 6012 <br /> Sen Ramon.CA 94583-0712 <br /> Mr. Philip lsoren.a, P.T. <br /> California.Regional Water Quality Control Board, Robert 0.Mihatovicb <br /> Pipoiine Program Manager <br /> Central Valley Region Phono:(926)842-1341 <br /> 3443 Routi.er Road, Suite A Facsimile:(9251842-0213 <br /> Sacramento,California 95827-3003 <br /> Confirmation of Approval <br /> Former Mansfield Property,Tracy,San .Joaquin County <br /> Former Lyoffi Loading Station., Tracy,Sa.n,Joaquin County <br /> Thompson Chevrolet Off-Site Issues, Patterson,Sta>nisl.a.u.s County <br /> California. <br /> Dear Mr. Isorena.: <br /> This letw is to confirm,your. August 29, 2000 telephone conversation.with Ms. Pen.n.y F'ottrell of <br /> Geomatrix Consultants(Geomatrix). it is Chevron.Lnvirotttln.en.tal. Management Company's <br /> (CB'MC) understanding that youapproved the revisions to the work plans for th.e subject sites. <br /> The following is a summary of the approved work plans as discussed during your telephone <br /> conversation. <br /> Former. Mansfield Pro city <br /> You approved.the proposed plan. to perform.four grab groundwater borings to characterize <br /> groundwater quality immediately d.owngra.dient of affected soil, as shown,on Figure 1. of the <br /> August 24, 2000 Geom.a.trix letter"Response to RWQ03 Comments, Former Mansfield <br /> Properly, Tracy,California". Work will be performed as approved and described in. the June 29, <br /> 2000 Geomatrix work plan. "Grab Groundwater Sampling Work Plan., Former Mansfield <br /> Property, Byron.Road.,Tracy, California." <br /> Former L, oth Loading Station <br /> You approved the proposed plan to perform two grab groundwater borings to evaluate the lateral. <br /> extent:of groundwater quality downgradi.ent of monitoring wells MW-6 a.n.d.MW-7 as shown.on. <br /> Figure 3. of the August 24, 2000 Geomatrix letter"Response to RWQCB Comments, Former. <br /> Lyoth,Loading Station ,Tracy, California". Work will. be performed as approved.and described <br /> in the June 29, 2000 Geomatrix work plan "Grab Groundwater Sampling Work Plan.,Former. <br /> Lyoth.Loading Station,26501 Banta Road, Tracy, California."As youhave discussed with Ms. <br /> Fottrell, the needto install permanent monitoring wells down.gradi,en.t of MW-6 and MW-7 will <br /> be determined after Chevron's review of the grab grou.n.dwater sample results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.