Laserfiche WebLink
09/23/98 WED 16:29 FAX 415 434 1365 GEOMATRIX SF Z002 <br /> Mr_Michael J. Infurna,Jr. <br /> September 14, 1998 <br /> Page 2 <br /> • The groundwater samples will be analyzed for BTEX using EPA Method 8020,PAHs using <br /> EPA Method 8270 SIM;for TPH using EPA Method 8015M quantified against a gasoline <br /> standard(C4 to C,2carbon range),and for TPH using EPA Method 8015M quantified against <br /> a diesel standard(CIo to C24 carbon range). <br /> The field work will be scheduled within one week of your approval of this proposed work plan_ <br /> You will be notified at least 48 hours in advance of the start of any field work. PIease call <br /> Elizabeth Lu(925/842-6855)if you have any questions or require additional 'information. <br /> Sincerely, <br /> K. L. Hower <br /> Project Manager <br /> California Site Remediation <br /> TETL0464.DOC <br /> Attachments: Figure 1 —Site Plan <br /> Master File Record Information Form(Green Form) <br /> Check for$234.00 <br /> cc: Elizabeth Lu—CPL/Geomatrix Consultants,Inc. <br /> Michael Keim—Geomatrix Consultants,Inc. <br /> Patrick Riddle (vj/o Atraq,-or4swr-s) <br /> Darlene Mansfield tw/v Orm^ttitm"YS� <br /> i <br />