My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
474
>
3500 - Local Oversight Program
>
PR0545203
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 4:39:27 PM
Creation date
1/24/2020 4:28:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545203
PE
3528
FACILITY_ID
FA0006261
FACILITY_NAME
WHEEL COUNTRY
STREET_NUMBER
474
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
474 GRANT LINE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I%e S"W <br /> FIELD PROCEDURES <br /> Site Safety Plan <br /> This plan describes the safety requirements for field work performed at the site. The site <br /> safety plan is applicable to personnel of Canonie/Smith Environmental Technologies <br /> Corporation (SMTH) who perform the field work. A copy of the site safety plan is available <br /> for reference by appropriate parties during the work. The onsite representative of SMTH acts <br /> as the Site Safety Officer. <br /> Drilling Methods <br /> Before drilling begins, SMTH notifies Underground Service Alert so that approximate <br /> locations of underground utility lines and structures can be marked. The soil borings are <br /> started by hand-angering or probing to a depth of 3 to 5 feet to minimize the possibility of <br /> damaging underground utilities. <br /> 4.0 Borings are drilled with a CME 55 or similar drill rig equipped with continuous-flight, hollow- <br /> stem augers. The augers are steam-cleaned before use in each boring to minimize cross- <br /> contamination of the borings. The drill cuttings are stored in Department of Transportation <br /> (DOT) 55-gallon drums or stockpiled onsite and covered with plastic pending disposal at an <br /> appropriate disposal facility. <br /> Soil Sampling in Borings <br /> Soil samples for analysis and identification are collected at approximately 5-foot intervals from <br /> the borings during drilling. Soil samples are collected by advancing the boring to a point just <br /> above the sampling depth and then driving a California-modified, split-spoon sampler <br /> containing clean brass sleeves through the hollow center of the auger into the soil. The <br /> sampler is driven 18 inches with a standard 140-pound hammer repeatedly dropped 30 inches. <br /> The number of blows needed to drive the sampler each successive 6 inches is counted and <br /> recorded to evaluate the relative consistency of the soil. Sampling equipment is cleaned <br /> between each use with an industrial non-phosphate soap and clean tap water. <br /> Soil Sample Labeling and Handling <br /> The soil samples selected for possible laboratory analysis are removed from the sampler and <br /> quickly sealed in their brass sleeves with Teflon tape and plastic caps. The respective sample <br /> containers are labeled in the field with the job number, sample location and depth, and date, <br /> and promptly placed in iced storage for transport to the laboratory. Chain of Custody Records <br /> are initiated in the field by the technician and accompany the samples to a laboratory certified <br /> by the State of California to perform the requested analyses. <br /> w <br /> SHELLSIFLDMTHDS.doc 1 <br /> w <br />
The URL can be used to link to this page
Your browser does not support the video tag.