Laserfiche WebLink
• <br /> L <br /> SMTN <br /> respectively. Purge water will be stored in 55-gallon drums approved for hazardous liquid <br /> storage pending laboratory analysis. <br /> L <br /> Task 4 - Report Preparation <br /> A PSA report will be prepared for submittal to SJCPHS. The report will summarize field and <br /> laboratory procedures as well as all analytical data. The lateral and vertical extent of soil and <br /> groundwater contamination will be, to the degree possible, defined and recommendations for <br /> additional investigation if necessary will be included in the PSA report. <br /> PROJECTED SCHEDULE <br /> The soil boring and well installation will require 2 days to be completed. The field work can <br /> be scheduled when the necessary-permits are obtained. Once the field work is complete and all <br /> laboratory results have been received, all data will be analyzed and the PSA report will be <br /> prepared. Preparation of this report'will take approximately three weeks. <br /> L <br /> L <br /> L <br /> L <br /> L <br /> t <br /> L95113\REP0RTSMP-0495.FNL 4 <br />