Laserfiche WebLink
i <br /> ATC SITE SAFETY PLAN <br /> On-site communications: 11 Radio 0 Verbal ❑ Hand Signals <br /> ❑ Other <br /> I <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio 0 Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work_activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP o CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All.contaminated personal protective equipment (i.e., <br /> loves coveralls)willbe placed in on-site dum ster <br /> Location of Wash Water. Restroom on-site <br /> i <br /> Location of Toilet. Restroom onsite <br /> Location of Drinking Water. ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP 0 CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure:' Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: None <br /> PAGE 11 <br />