My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3776
>
3500 - Local Oversight Program
>
PR0545211
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 4:51:47 PM
Creation date
1/24/2020 4:45:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545211
PE
3528
FACILITY_ID
FA0005216
FACILITY_NAME
ALEXANDER GILLILAND
STREET_NUMBER
3776
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23907002
CURRENT_STATUS
02
SITE_LOCATION
3776 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 <br /> samples are collected, four brass cylinders will be collected for every 50 cubic yards of <br /> material to be sampled unless otherwise specified by the lead regulatory agency. The <br /> samples will be composited by the state certified laboratory personnel prior to testing. <br /> 12.0 GROUNDWATER SAMPLING PROTOCOL <br /> Prior to arriving at the sampling site, all sampling equipment will be washed•with nonphosphate. <br /> I <br /> detergent (Alconox or equivalent), and rinsed twice with tap water, once with.acetone, and once <br /> with deionized water. . this procedure will be carried out on-site before sampling of other` <br /> monitoring wells, if more than one well is to be sampled.with the sample sampling device. <br /> Immediately prior to sampling, the depth to water (DTW) in the well will be recorded. The <br /> thickness of product on top of the groundwater, if present, will be measured using an interface <br /> probe. The procedure for monitoring is presented in Section 9.0 (Groundwater Monitoring <br /> Protocol). <br /> If free product is detected, analysis of groundwater at the interface for dissolved product will not <br /> be conducted. A product sample will be collected for source identification. If all free product �. <br /> i <br /> cannot be removed, an interval specific sampling device may be utilized to collect a sample from <br /> below the zone of free product. Before collecting groundwater samples from each well, the well <br /> will be purged until indicator parameters (temperature, conductivity, and pH) stabilize. This will <br /> entail the removal of at least four well casing volumes by bailing or pumping. The criteria for <br /> determining well casing volumes and temporary storage of purged water is outlined. in Section <br /> 10.0 (Well Development Protocol). The indicator parameter measurements will be taken both <br /> before and after purging of each well casing volumes. Once the well is purged and indicator <br /> parameters have stabilized, a sample will be collected after the water level approaches 80 percent <br /> W:\Adrnin\She11s\QAQC-98.D0C <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.