Laserfiche WebLink
Clayton <br /> CO%SL I.T NTS <br /> DRILLING, WELL CONSTRUCTION, AND SAMPLING PROTOCOLS <br /> FOR <br /> BOREHOLE/MONITORING WELL INSTALLATION <br /> Clayton Environmental Consultants, Inc. acquires the proper governmental agency permits to <br /> bore, drill, or destroy all proposed horeholes and monitoring wells that intersect with <br /> groundwater aquifers and writes a health and safety plan. <br /> Clayton subcontracts only with drillers who possess a current C-57 water well contractor's <br /> license issued by the State of California and whose personnel have attended the OSHA 40- <br /> hour Hazardous Materials Safety Training. Prior to starting work, a "tailgate" safety meeting <br /> including discussion of the safety hazards and precautions relevant to the particular job will <br /> be held with all personnel working on the job. Well drillers are identified on permit <br /> applications. <br /> Borings are drilled dry by hollow- or solid-stem, continuous Might augers. Augers, drill rods, <br /> 1 and other working components of the drilling rig are steam-cleaned before arriving onsite to <br /> I prevent the introduction of contaminants. These components are also steam-cleaned <br /> between borings away from boring locations. Cleaned augers, rods, and other components <br /> fare stored, and/or covered when not in use. <br /> t <br /> ` Our bore logs include a detailed description of subsurface stratigraphy. Clayton examines the <br /> soil brought to the surface by drilling operations, and samples undisturbed soil.every 5 feet or <br /> as otherwise specified. Soil cuttings are screened for hydrocarbon contamination using a <br /> 1 photoionization detector. Boring logs are filled out in the field by a professional geologist, <br /> !l - civil engineer, engineering geologist who is registered by the State of California, or a <br /> " technician who is trained and working under the supervision of one of the previously <br /> mentioned persons, using the Unified Soil Classification System. <br /> SOIL SAMPLM <br /> Soil samples are taken every 5 feet, at areas of obvious contamination, or as otherwise <br /> i specified,.with a California modified split-spoon sampler that is lined with three six-inch brass <br /> tubes. The sampler and rod'are inserted into the borehole to the current depth and a <br /> hammer of known weight and height above the sampler are allowed to free-fall onto the rod, <br /> advancing the assembly 18 inches into undisturbed soil. Clayton uses the number of blows <br /> necessary,to drive the sampler-into_the ground to help evaluate the.consistency-of_materials - -- - <br /> encountered. The sampler is then pulledfrom the borehole and disassembled, and the three <br /> brass tubes.are separated for inspection and labeling. <br /> Clayton uses new brass liners or liners cleaned.with a trisodium phosphate (TSP) solution,. <br /> ' double rinsed with clean tap water, and air dried prior to each sampling. The sampler is also <br /> 3 cleaned with TSP and rinsed with tap water between sampling events, <br /> ' 1 proo-Lnv <br /> S <br /> .. <br /> LS <br /> M¢S ALF .1�-.'�. <br />