My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REMEDIAL ACTION PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
14821
>
2900 - Site Mitigation Program
>
PR0518596
>
ARCHIVED REPORTS_REMEDIAL ACTION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 9:01:16 AM
Creation date
1/27/2020 8:25:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REMEDIAL ACTION PLAN
RECORD_ID
PR0518596
PE
2960
FACILITY_ID
FA0013993
FACILITY_NAME
TRACY PUMP STATION
STREET_NUMBER
14821
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20919006
CURRENT_STATUS
01
SITE_LOCATION
14821 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAIC BORING NO.: SB-24 SHEET 1 OF 1 <br /> rmm srkncerosoaebrw PROJECT: Former Tracy Pump Station <br /> LOCATION: 14821 West Grant Line Road,Tracy,California <br /> COORDINATES: Y 37.7598622.X -121.4954467 PROJECTNO.: 26011S154A <br /> SURFACE ELEVATION: NA DATUM: NA LOGGED BY: Sergio Schirripa <br /> a <br /> T10 -1� <br /> �O <br /> COMPLETIONw w <br /> a <br /> w 0- 0- <br /> DESCRIPTION DETAIL <br /> N2 Zrn ZCo <br /> Q CLAY(CL):about 100%F very dark gray(10YR 3/1); !—;;•-• <br /> ' HA dry,fine. <br /> 100 <br /> 1.4 <br /> Native soil <br /> 0.5 <br /> ' SB-24 SA <br /> 3' <br /> ' 0.0 Clayey SAND (SC): about 30%F 70%S yellowish <br /> brown(10YR 5/4);dry,dense. <br /> 5 0.0 SB-24 SA CLAY (CL): about 70%F 30%S yellowish brawn <br /> 5' (10YR 5/4);dry;firm. <br /> Nest cement <br /> 0 <br /> � 0.0 <br /> ' d 0.0 <br /> E <br /> 1 0.0 SB-24 SA <br /> $ 8 <br /> I a Boring terminated at 8.5 feet bgs. <br /> c? <br /> 0 <br /> w <br /> 1 0 <br /> 0 <br /> w <br /> a <br /> z <br /> 0 <br /> 1 a <br /> y <br /> E <br /> a <br /> DRILLING CONTRACTOR: Penecore Drilling REMARKS: <br /> z DRILLING METHOD: Hand Auger <br /> z <br /> ' w DRILLING EQUIPMENT: Hand Auger <br /> a <br /> o DRILLING STARTED: 5/2/11 ENDED: 5/2/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.