Laserfiche WebLink
1 <br /> ��� BORING NO.: SB-30 SHEET 1 OF 1 <br /> From Sdmrerosowtwns PROJECT: Former Tracy Pump Station <br /> LOCATION: 14821 West Grant Line Road,Tracy,California <br /> COORDINATES: Y 37.75991032,X -121.4952912 PROJECT NO.: 26011 S1 54A <br /> SURFACE ELEVATION: NA DATUM: NA LOGGED BY: Sergio Schirripa <br /> a. <br /> W o f O a a > a 3 Z > °m GEOLOGIC COMPLETION <br /> o LL o a Q<Lu <br /> Z w m 0 ° (5� DESCRIPTION DETAIL <br /> z N u) Z O W m <br /> Q O_ K <br /> CLAY(CL):about 100%F dark yellowish brawn;dry, •= <br /> HA firm. <br /> 100 4•l'eti�i.' <br /> 0.0 <br /> ';.-:t;."? Native soil <br /> 0.0 <br /> As above:brown;soft. <br /> �•.moi. <br /> 0.0 SB-30 SA <br /> 3' <br /> ' 0.0 CLAY(CL):about 90%F 10%S yellowish brown;dry; <br /> soft. <br /> 5 0.0 SB-30 SA CLAY(CL):about 60%F 40%S yellowish brawn;dry; <br /> 5' very soft;fine sands. <br /> Neat cement <br /> r <br /> u 0.0 Clayey SAND (SC): about 40%F 60%S yellowish <br /> 4 brawn;dry,loose;fine to medium sands. <br /> a 0'0 CLAY(CL):about 60%F 40%S yellowish brawn;dry; <br /> soft. <br /> z <br /> 0.0 SB-30 SA CLAY(CL):about 100%F yellowish brown;dry;firm. <br /> a 8' <br /> x <br /> Boring terminated at 8.5 feet bgs. <br /> 'o <br /> w <br /> w <br /> a <br /> z <br /> F <br /> ' a <br /> N <br /> f <br /> J <br /> 1 <br /> DRILLING CONTRACTOR: Peneoore Drilling REMARKS: <br /> i DRILLING METHOD: Hand Auger <br /> z <br /> W DRILLING EQUIPMENT: Hand Auger <br /> a <br /> o DRILLING STARTED: 5/3/11 ENDED: 5/3/11 <br />