My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REMEDIAL ACTION PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
14821
>
2900 - Site Mitigation Program
>
PR0518596
>
ARCHIVED REPORTS_REMEDIAL ACTION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 9:01:16 AM
Creation date
1/27/2020 8:25:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REMEDIAL ACTION PLAN
RECORD_ID
PR0518596
PE
2960
FACILITY_ID
FA0013993
FACILITY_NAME
TRACY PUMP STATION
STREET_NUMBER
14821
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20919006
CURRENT_STATUS
01
SITE_LOCATION
14821 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORING NO.: SB-33 SHEET 1 OF 1 <br /> Rmascbrca toSoMkow PROJECT: Former Tracy Pump Station <br /> LOCATION: 14821 West Grant Line Road,Tracy,California <br /> COORDINATES: Y 37.76007591,X -121.4954049 PROJECTNO.: 26011S154A <br /> SURFACE ELEVATION: NA DATUM: NA LOGGED BY: Sergio Schirripa ' <br /> _ U w j W fn K <br /> a w C' Ea aw o_ o- p z Be > om GEOLOGIC COMPLETION <br /> o LL a s Z z N Z m 'o $to w N DESCRIPTION DETAIL <br /> o <br /> HA CLAY(CL):about 100%F brown;dry;firm. •`_; ' <br /> 100 <br /> 0.0 .•'ori.' <br /> ` <br /> Native soil <br /> 0.0 <br /> As above:soft. <br /> 0.0 : <br /> fifi i <br /> Neat cement <br /> 5 0.0 SB-33 SA ' <br /> 5' <br /> _ As above:some black mottling. <br /> 0 0.0 As above:no mottling. <br /> Refusal at 6 feet bgs. <br /> 9 <br /> 5 <br /> f <br /> m <br /> OL <br /> x <br /> 'a <br /> w <br /> LL <br /> K <br /> 0- <br /> a <br /> 0 <br /> F <br /> h <br /> N <br /> E <br /> J <br /> a <br /> U <br /> DRILLING CONTRACTOR: Penecore Drilling REMARKS: Subsurface debts encountered at 6 teat b,.. <br /> z DRILLING METHOD: Hand Auger <br /> z <br /> w DRILLING EQUIPMENT: Hand Auger ' <br /> a <br /> o DRILLING STARTED: 5/4/11 ENDED: 5/4/11 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.