Laserfiche WebLink
' Mr.Michael Oliphant-CEMC <br /> Remedial Action Plan <br /> ' Former Tracy Pump Station June 23,2011 <br /> Page 4 of 4 <br /> compactor or similar) to the satisfaction of the permitting agency and/or the property <br /> owner. SAIC will observe the placement and compaction of the backfill material. The <br /> ' excavation contractor will be responsible for soil-density tests at representative <br /> locations to confirm that adequate compaction is obtained. Topsoil suitable for <br /> agricultural use will be placed on the upper 1 to 2 feet of the backfilled area. SAIC will <br /> discuss backfilling requirements with the property owner and will return the backfilled <br /> area to the property owner's specifications. <br /> REPORTING <br /> SAIC anticipates beginning the excavation activities during late third quarter 2011 <br /> pending Central Valley RWQCB acceptance of this RAP, and procurement of all <br /> necessary permits, bonds, and access agreements. A report summarizing the activities <br /> will be submitted to the Central Valley RWQCB in the fourth quarter 2011. <br /> ' If you have any questions regarding this RAP,please contact Justin Sobieraj at <br /> (510) 466-7119. <br /> Sincerely, <br /> ' SAIC Energy,Environment& Infrastructure,LLC <br /> O <br /> W JUSTI W..024 <br /> tm� <br /> ' <br /> Justit obie05, <br /> raj, PG UP�32` <br /> End onmental Project Manager f"'FOFGP�� <br /> Enclosures: <br /> ' Figure 1. Vicinity Map <br /> Figure 2. Site Map <br /> Figure 3. Proposed Excavation Area <br /> ' Table 1. Summary of Soil Analytical Results(BTEX) <br /> Table 2. Summary of Soil Analytical Results (PAHs) <br /> Table 3. Summary of Confirmation Soil Analytical Results (BTEX) <br /> ' Table 4. Summary of Confirmation Soil Analytical Results (PAHs) <br /> Attachment A. Previous Environmental Activities <br /> Attachment B. Boring Logs <br /> ' Attachment C. Laboratory Analytical Reports <br /> Attachment D. Data Usability Summary <br /> i <br /> 1 <br /> 1 <br />