My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REMEDIAL ACTION PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
14821
>
2900 - Site Mitigation Program
>
PR0518596
>
ARCHIVED REPORTS_REMEDIAL ACTION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 9:01:16 AM
Creation date
1/27/2020 8:25:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REMEDIAL ACTION PLAN
RECORD_ID
PR0518596
PE
2960
FACILITY_ID
FA0013993
FACILITY_NAME
TRACY PUMP STATION
STREET_NUMBER
14821
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20919006
CURRENT_STATUS
01
SITE_LOCATION
14821 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Mr.Michael Oliphant-CEMC <br /> Remedial Action Plan <br /> ' Former Tracy Pump Station June 23,2011 <br /> Page 4 of 4 <br /> compactor or similar) to the satisfaction of the permitting agency and/or the property <br /> owner. SAIC will observe the placement and compaction of the backfill material. The <br /> ' excavation contractor will be responsible for soil-density tests at representative <br /> locations to confirm that adequate compaction is obtained. Topsoil suitable for <br /> agricultural use will be placed on the upper 1 to 2 feet of the backfilled area. SAIC will <br /> discuss backfilling requirements with the property owner and will return the backfilled <br /> area to the property owner's specifications. <br /> REPORTING <br /> SAIC anticipates beginning the excavation activities during late third quarter 2011 <br /> pending Central Valley RWQCB acceptance of this RAP, and procurement of all <br /> necessary permits, bonds, and access agreements. A report summarizing the activities <br /> will be submitted to the Central Valley RWQCB in the fourth quarter 2011. <br /> ' If you have any questions regarding this RAP,please contact Justin Sobieraj at <br /> (510) 466-7119. <br /> Sincerely, <br /> ' SAIC Energy,Environment& Infrastructure,LLC <br /> O <br /> W JUSTI W..024 <br /> tm� <br /> ' <br /> Justit obie05, <br /> raj, PG UP�32` <br /> End onmental Project Manager f"'FOFGP�� <br /> Enclosures: <br /> ' Figure 1. Vicinity Map <br /> Figure 2. Site Map <br /> Figure 3. Proposed Excavation Area <br /> ' Table 1. Summary of Soil Analytical Results(BTEX) <br /> Table 2. Summary of Soil Analytical Results (PAHs) <br /> Table 3. Summary of Confirmation Soil Analytical Results (BTEX) <br /> ' Table 4. Summary of Confirmation Soil Analytical Results (PAHs) <br /> Attachment A. Previous Environmental Activities <br /> Attachment B. Boring Logs <br /> ' Attachment C. Laboratory Analytical Reports <br /> Attachment D. Data Usability Summary <br /> i <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.