Laserfiche WebLink
BORING NO.: SB-30 SHEET 1 OF 1 <br /> PROJECT: Former Tracy Pump Station <br /> LOCATION: 14821 West Grant Line Road,Tracy,California <br /> ' COORDINATES: Y 37.75991032,X -121.4952912 PROJECT NO.: 26011S154A <br /> SURFACE ELEVATION: NA DATUM: NA LOGGED BY: Sergio Schirripa <br /> Q ¢ } <br /> T-- ~ U J w W a a p z o > m GEOLOGIC COMPLETION <br /> o LL o ¢¢z Q in o >- DESCRIPTION DETAIL <br /> Z Cn-- to Z U W to <br /> Q <br /> ' CLAY(CL):about 100%F dark yellowish brown;dry; >�;:•V <br /> HA firm. <br /> 100 <br /> 0.0 <br /> ''• Native soil <br /> OA r <br /> As above:brown;sok. <br /> r •�,'4 <br /> 0.0 S6-30 SA � <br /> 3' <br /> 0.0 CLAY(CL):about 90%F 10%S yellowish brown;dry; <br /> sdt <br /> 5 0.0 58-30 SA CLAY(CL):about 60%F 40%S yellowish brawn;dry; <br /> 5 very sok;fine sands. <br /> � Neat cement <br /> a <br /> 0.0 Clayey SAND (SC): about 40%F 60%S yellowish <br /> S brown;dry,loose:fine to medium sands. <br /> cece <br /> tu <br /> 0.0 CLAY(CL):about 64%F 40%S yellowish brown;dry; <br /> I" sok- <br /> ' z <br /> m 0.4 SB-30 SA CLAY(CL):about 100%F yellowish brown;dry,firm. <br /> a 8' <br /> ' a <br /> z <br /> oBaring terminated at 8.5 feet bgs. <br /> N <br /> W <br /> ' LL <br /> O <br /> a <br /> w <br /> a <br /> z <br /> O <br /> a <br /> a <br /> ' V <br /> � DRILLING CONTRACTOR: Penecore Drilling REMARKS: <br /> i DRILLING METHOD: Hand Auger <br /> z <br /> WDRILLING EQUIPMENT: Hand Auger <br /> o DRILLING STARTED: 513!11 ENDED: 513111 <br />