Laserfiche WebLink
' 9. Earth Moving Activities <br /> Please mark the box preceding each measure that will be implemented: <br /> Control for earthmoving activities must include one or more of the following: <br /> ®Pre-wet the ground to the depth of anticipated cuts; <br /> ®Suspend grading operations when wind speeds are high enough to result in dust emissions crossing the property <br /> ' line, despite the application of dust mitigation measures; <br /> ®Apply water prior to any land clearing; or <br /> ®Any other measure(s)as effective as the measures listed above: (Briefly describe below) <br /> ' soil with asbestors material to be direct loaded into lined bins. <br /> 10. Off-Site Transport <br /> Please mark the box preceding each measure that will be implemented: <br /> THIS MEASURE MUST BE ADDRESSED: <br /> The owner or operator must ensure that no trucks are allowed to transport excavated material off-site <br /> ' unless: <br /> ®Maintain trucks such that no spillage can occur from holes or other openings in cargo compartments; AND <br /> ®Loads are adequately wet; <br /> ' AND Either of the following measures: <br /> ®Cover with tarps; or <br /> ❑Load such that the material does not touch the front, back, or sides of the cargo compartment at any point less <br /> 1 than six inches from the top and that no point of the load extends above the top of the cargo compartment. <br /> 11 . Post Construction Stabilization of Disturbed Areas <br /> Please mark the box preceding each measure that will be implemented-, <br /> Upon completion of the project, disturbed surfaces shall be stabilized using one or more of the <br /> following: <br /> ❑Establish a vegetative cover; <br /> ❑Place at least three (3.0) inches of non-asbestos-containing material; <br /> ❑Paving: or <br /> ' ❑Any other measure deemed sufficient to prevent wind speeds of ten (10) miles per hour or greater from causing <br /> visible dust emissions. (Briefly describe below) <br /> Asbestos material mixed in soil to be removed entirely from <br /> site <br /> 12. Recordkeeping and Reporting Requirements <br /> (A) The owner/operator shall maintain all of the following records for at least seven (7) years <br /> following the completion of the construction project: <br /> ®The results of any air monitoring conducted at the request of the APCO: <br />