Laserfiche WebLink
C lCt%ton <br /> 7 I AIR MONITORING <br /> An organic vapor meter (OVM) wall be used onsite to monitor the air at the <br /> work place It hydrocarbon odors become detectable or if these arc detected with <br /> the. OVM at concentration of 10 ppm range in the air of total organic <br /> compounds, the personnel assigned to the project will upgrade their personal <br /> protection with half-face respirators with organic, vapor type cartridges <br /> Airborne dust will be depressed using water spray or workers will be required to <br /> wear dust masks <br /> Workers are required to wash hands and face thoroughly atter work or before <br /> meals, and to shower as soon as possible alter completing onsite work for the day <br /> This report prepared by _ _ — <br /> Sami Malaeb <br /> Environmental Engineer <br /> This report reviewed by <br /> Philip T Numoto, CIH <br /> Supervisor, Industrial Hygic,ne Services <br /> Western Operations <br /> July 20, 1430 <br /> -5- <br />