My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
455
>
3500 - Local Oversight Program
>
PR0545202
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 9:48:07 AM
Creation date
1/27/2020 9:26:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545202
PE
3528
FACILITY_ID
FA0003124
FACILITY_NAME
7-ELEVEN INC. STORE #20304
STREET_NUMBER
455
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
455 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�l <br /> Work Plan for Groundwater Extraction Well Installation 3 <br /> The Southland Corporation,455 Grant Line Road,Tracy,CA April 12,19% <br /> placed in DOT-approved 55-gallon drums pending treatment through the existing groundwater <br /> remediation system . <br /> At least 48 hours after development,the groundwater extraction well will be gauged to measure static <br /> liquid levels. Liquid levels will be monitored using an ORS Environmental Equipment INTERFACE <br /> PROBE'Well Monitoring System,which consists of a dual optical sensor and electrical conductivity <br /> probe that distinguishes between water and petroleum products. The top of casing of the well will be <br /> professionally surveyed relative to existing wells at a later date. <br /> TASK 4: TRENCHING AND GROUNDWATER EXTRACTION <br /> A trench for the groundwater extraction system piping will be excavated to connect the newly installed <br /> groundwater extraction well with the existing GWES piping (Figure 2). Soil generated during trench <br /> excavation will be stockpiled and covered with plastic sheeting pending characterization and proper <br /> disposal. <br /> A down hole electrical submersible pump will be installed in the well to extract groundwater and <br /> determine recovery rates. The pump will be operated at maximum sustainable rates to monitor <br /> influence in wells MW-8,MW-9, and MW-10. <br /> TASK 5: WATER SAMPLE ANALYSES <br /> After the groundwater extraction line is connected from the well to the remediation system, a <br /> groundwater sample will be collected as part of standard system operation and maintenance. The <br /> collected groundwater sample will be analyzed by a State-certified analytical laboratory (GTEL <br /> Environmental Laboratories in Wichita, KS)for BTEX, methyl-tert-butyl-ether(MTBE), and TPH-G, by <br /> EPA methods 8020/8015 modified. If MTBE is detected using the EPA method 8020 analysis, its <br /> presence will be confirmed using EPA method 8260. <br /> TASK 6: REPORT PREPARATION <br /> Groundwater Technology will prepare a report summarizing the data collected under the scope of work <br /> detailed above. The report will document the methods and results of the work,summarize laboratory <br /> analytical results, and include appropriate maps. This report will provide available information as <br /> outlined in SJCEHD's Site Assessment Report Checklist and will provide an evaluation of the feasibility <br /> of continuing with groundwater extraction at the site. <br /> 17141 GROUNDWATER <br /> =0TECHNOLOGY r <br />
The URL can be used to link to this page
Your browser does not support the video tag.