Laserfiche WebLink
U <br /> ❑❑© GROUNDWATER <br /> DEE] TECHNOLOGY, INC. 4057 Port Chicago Highway,Concord,CA 94520(415)671-2387 <br /> FAX:(415)685-9148 <br /> Rry <br /> vVeD <br /> . <br /> March 15, 1993 MAR 1 7 1993 <br /> ENVIRONMENTAL HEALTH <br /> Project No. 020203767 PERMIT/SERVICES <br /> Mr.,Bob Vasquez <br /> The Southland Corporation <br /> 5820 Stoneridge Mall Road, Suite 310 <br /> Pleasanton, CA 94588 !b <br /> SUBJECT: Work Plan for Groundwater Extraction Well Installation <br /> Southland Site No. 20304 <br /> 455 Grant Line Road <br /> Tracy, California <br /> Dear Mr. Vasquez: <br /> Groundwater Technology, Inc. has prepared this Work Plan for the installation of one groundwater <br /> extraction well at the site referenced above (Attachment 1, Figure 1). The scope of work consists of <br /> drilling one soil boring and installing one groundwater extraction well, sampling soil and <br /> i <br /> groundwater, submitting soil and groundwater samples for laboratory analyses, and preparing a <br /> summary report. The tasks included in this scope of work are discussed below. <br /> TASK 1: SITE-SPECIFIC HEALTH AND SAFETY PLAN, BACKGROUND REVIEW, AND <br /> PERMITTING <br /> A site-specific Health and Safety Plan has been prepared by Groundwater Technology as required <br /> by the Occupational Health and Safety Administration Standard "Hazardous Waste Operations and <br /> Emergency Response" guidelines (29 CFR 1910.120). The document will be reviewed and signed by <br /> all Groundwater Technology personnel and subcontractors performing work at the site before field <br /> operations begin. <br /> Extraction well permit applications will be completed and submitted to the San Joaquin County <br /> Public Health Services Division and the City of Tracy Permit Division. <br /> WP3767A1.SLL <br /> 1 <br /> Offices throughoul the U.S..Canada and Overseas � J <br />