My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002275
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
455
>
3500 - Local Oversight Program
>
PR0545202
>
ARCHIVED REPORTS_XR0002275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 11:06:28 AM
Creation date
1/27/2020 9:57:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002275
RECORD_ID
PR0545202
PE
3528
FACILITY_ID
FA0003124
FACILITY_NAME
7-ELEVEN INC. STORE #20304
STREET_NUMBER
455
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
455 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southland AND. 20304 <br /> 455 Grant Line Road <br /> Tracy,California <br /> Start 1993 <br /> Task Name Date Duration Aar May Jun JrJ Auy Sea Oct Nov <br /> Work Plan Approval 28-Apr-93 13.0 clays <br /> Permit(wells) 3-May-93 .50 days <br /> Drill/Install 12-Ma y-93 1.0 day <br /> r r r r r r r <br /> Develop 14-May-93 1.0 day <br /> a s r r r r r r <br /> Phase I 28-Apr-93 142.0 days ; <br /> Treatment System Design 28-Apr-93 66.0 clays r ' <br /> Treatment System Permitting 28-Jun-93 24.0 days <br /> Treament System Installation Wun-93 9.0 days <br /> Treatment S y stem Te sting 14-jun-93 10LO days <br /> Treatment System Stan-up 28-Jun-93 24.0 days <br /> r r r <br /> Treatment System O&M 28-Jun-93 10MO days r ' <br /> Sal Vapor Pilot Test 9-Aug-93 10.0 days <br /> Receive Analytical Resuhs 16-Aug-93 150 days <br /> Data Evaluation 16-Aug-93 20.0 days <br /> Summary Report to Agency(RAP) 2-An¢93 43.0 days <br /> Agency Approval 27-Sep-93 20.0 days <br /> Phase It 9-Aug-93 76.0 days <br /> Soil Remedai System Design 9-Aug-93 68.0 days <br /> Soil Remedial Permitting 7-Sep-93 48.0 days <br /> Soil Remedial installation 1-Nov-93 10.0 days <br /> r r r r r r r r <br /> System Testing 15-Nov-93 9.0 days <br /> r r r r r r r r <br /> System Stan-up 26-Nov-93 1 0.0 ; ; ; ; ; ; •; <br /> System Operation&Maintenance 26-Nov-93 1 0.0 ' ' ' ' ' ' ' •' <br /> Groundwater Technology,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.