My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002285
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
455
>
3500 - Local Oversight Program
>
PR0545202
>
ARCHIVED REPORTS_XR0002285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 10:58:50 AM
Creation date
1/27/2020 10:05:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002285
RECORD_ID
PR0545202
PE
3528
FACILITY_ID
FA0003124
FACILITY_NAME
7-ELEVEN INC. STORE #20304
STREET_NUMBER
455
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
455 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Harding Lawson Associates <br /> b. Carbon Reactors - Two (2) Sun-Ag Inc. Model 2000V <br /> vapor phase adsorbers. Maximum flow rate capacity <br /> Of 800 CFM. Each reactor will contain 21000 <br /> pounds of Virgin SA4x6CC Vapor Phase Activated <br /> Carbon. <br /> ~' 2. Operating Schedule <br /> Continuous - 24 hours/day, 7 days/week <br /> 46.. <br /> 3 . Maximum Daily Production Rates and Expected Yields <br /> Typical of vapor extraction systems, we estimate that <br /> initial vapor concentrations will be relatively high, <br /> but then decline rapidly to a steady low concentration <br /> level. Without actual pump data from the trench (has <br /> not been installed yet) we need to make some <br /> assumptions. Maximum expected flow rate of the blower <br /> manifolded to the trench, former tank laterals, and the <br /> t. soil pile is anticipated to be 200 CFM. The expected <br /> initial vap3r concentrations should be no higher than <br /> 20, 000 mg/M . After four days of operation, the vapor <br /> concentrations should be steady at approximately 1, 000 <br /> mg/M and will gradually decline to less than 400 mg/M3 <br /> during the first year of operation. <br /> Based on these assumptions, the calculated yield in <br /> pounds per day of the VES is : <br /> �. Daily Yield = mg/M3 x ft3/min x M3/35. 3 ft3 x <br /> 1, 440 min/day x lb/453 , 592 mg <br /> ti. <br /> First Day Yield = 20, 000 x 200 x 1,440 / 35. 3 x <br /> 453 ,592 <br /> 360 lbs/day <br /> �. Fourth Day Yield = 1, 000 x 200 x 1,440 / 35. 3 x <br /> 453 , 592 <br /> = 18 lbs/day <br /> An average value of the first and fourth day is used to <br /> calculate second and third day yields as 189 lbs/day. <br /> Total estimated yield of VES during the first year with <br /> no decline in vapor concentrations from 1, 000 mg/M3 is <br /> approximately 7, 200 pounds of gasoline as vapor. This <br /> is a high value estimate. Actual values should be much <br /> lower as the vapor concentration are expected to <br /> decline throughout �he operation of the VES. If values <br /> decline to 400 mg/M after one year of operation, the <br /> 032909P/RS3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.