' Harding Lawson Associates <br /> After receipt of an Authority to Construct permit from <br /> the SJVUAPCD, we expect that installation of the soil-gas <br /> treatment package will take one to three weeks. After the VES is <br /> installed, influent and effluent air samples will be collected to <br /> determine the efficiency of the system and adjust operations as <br /> necessary. The VES system will be monitored according to the <br /> schedule determined by the SJVUAPCD. Samples will be collected <br /> ' in Tedlar bags or carbon tubes and transported to the laboratory <br /> under chain-of-custody protocol; concentrations will also be <br /> periodically measured in the field using an organic vapor <br /> analyzer. This remediation scheme will be evaluated as treatment <br /> continues and approximate modification made. <br /> B. Schedule <br /> We anticipate that the proposed soil and groundwater <br /> remediation system will be operational within three months after <br /> rreceipt of an Authority to Construct permit from the SJVUAPCD. <br /> ' We expect that the permit will require two to three months for <br /> processing. After operation commences, the progress of the <br /> ' system and the quality groundwater monitoring will be completed. <br /> If groundwater quality continues to improve then no additional <br /> systems will be proposed for groundwater treatment. <br /> If groundwater conditions show no improvement, then <br /> ' permitting and installation of a groundwater treatment system <br /> will being. A groundwater remediation system could be <br /> operational within four months after a NPDES permit to discharge <br /> ' 29 <br />