My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002286
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
455
>
3500 - Local Oversight Program
>
PR0545202
>
ARCHIVED REPORTS_XR0002286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 11:21:20 AM
Creation date
1/27/2020 10:05:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002286
RECORD_ID
PR0545202
PE
3528
FACILITY_ID
FA0003124
FACILITY_NAME
7-ELEVEN INC. STORE #20304
STREET_NUMBER
455
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
455 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Harding Lawson Associates <br /> After receipt of an Authority to Construct permit from <br /> the SJVUAPCD, we expect that installation of the soil-gas <br /> treatment package will take one to three weeks. After the VES is <br /> installed, influent and effluent air samples will be collected to <br /> determine the efficiency of the system and adjust operations as <br /> necessary. The VES system will be monitored according to the <br /> schedule determined by the SJVUAPCD. Samples will be collected <br /> ' in Tedlar bags or carbon tubes and transported to the laboratory <br /> under chain-of-custody protocol; concentrations will also be <br /> periodically measured in the field using an organic vapor <br /> analyzer. This remediation scheme will be evaluated as treatment <br /> continues and approximate modification made. <br /> B. Schedule <br /> We anticipate that the proposed soil and groundwater <br /> remediation system will be operational within three months after <br /> rreceipt of an Authority to Construct permit from the SJVUAPCD. <br /> ' We expect that the permit will require two to three months for <br /> processing. After operation commences, the progress of the <br /> ' system and the quality groundwater monitoring will be completed. <br /> If groundwater quality continues to improve then no additional <br /> systems will be proposed for groundwater treatment. <br /> If groundwater conditions show no improvement, then <br /> ' permitting and installation of a groundwater treatment system <br /> will being. A groundwater remediation system could be <br /> operational within four months after a NPDES permit to discharge <br /> ' 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.