Sod Excavation and Second Quarter Post-Treatment Monitoring and sampling Report 5 <br /> • The Southland Corporation,Store#20304,455 Grant Line Road,Tracy,CA _ June 9,1998 <br /> 4 0 GROUNDWATER MONITORING WELL INSTALLATION <br /> 4.1 Soil Bonng <br /> On May 8, 1998, Fluor Daniel GTI supervised the drilling of one soil bonng to a depth of 10 feet BGS <br /> utilizing a truck-mounted dnll ng equipped with 8-4nch outside-diameter(O D) hollow-stern augers All <br /> dnlling equipment was steam cleaned prior to dnlling the bonng, and sampling equipment was washed in <br /> an Alconoxo(detergent)solution and nnsed with water between sampling intervals All soil and rinse water <br /> generated during the drilling was placed in labeled Department of Transportation (DOT)-approved <br /> 55-gallon drums and left on the site pending transportation and disposal <br /> 4 2 Soil Sample Collection <br /> Soil samples were collected from the borehole at a depth of 5 and 10 feet BGS The samples were <br /> collected using a 2-inch O D California split-spoon sampler, lined with three 1 5-inch-diameter by <br /> 6-inch-long brass tubes The sampler was driven 18 inches ahead of the augers at each sample point <br /> Soil samples were field screened for hydrocarbon vapors using a photo-ionization detector Soil was <br /> logged using the Unified Soil Classification System by a Fluor Daniel GTI field geologist working under the <br /> supervision of a California registered geologist(Appendix E) One sample tube from each sampling interval <br /> . was sealed, labeled,and placed on ice in an insulated container for transport under chain-of-custody to <br /> state-certified Core Laboratories in Anaheim, California <br /> The soil sample collected at 10 feet BGS was analyzed for BTEX, MTBE and TPH-g using EPA Methods <br /> 8020/modified 8015 <br /> 4.3 Well Installation <br /> on May 8, 1998, a groundwater monitoring well was installed in the boring (MW-16) at the location shown <br /> on figure 2 The purpose of the monrtonng well was to replace monitoring wells MW-8,MW-9,and MW-10 <br /> removed during the excavation activity The groundwater monitoring well was constructed of <br /> 2-inch-diameter, Schedule 40 polyvinyl chlonde casing with flush threads, and 0 020-4nch-slot well screen <br /> The well screen was installed in the boring from 3 feet to 7 feet Sand was placed in the well annulus from <br /> the bottom of the boring to approximately 1 foot above the top of the well screen The well annulus was <br /> sealed with approximately 1 foot of bentonite pellets saturated in place on top of the sand pack,and <br /> neat-cement grout to approximately 10 inches BGS The wellhead is protected at the surface by locking, <br /> water-tight well cap and traffic-rated street box(with watertight bolted lid)set in concrete Well construction <br /> details are shown on the dnll log in Appendix E <br /> FLUOR DANIEL GTI <br /> 20304ex.rpt 1�5— <br />