• Groundwater Extraction Well Installation Summary Report Page 3 <br /> The Southland Corporation 455 Grant line Road Tracy California December 6, 1996 <br /> relative to top-of-well-casing to determine the static water level Approximately 60 gallons of <br /> groundwater was purged from each well and stored In 55-gallon DOT-approved drums to be pumped <br /> through the groundwater treatment system <br /> The top of casing and rim of each new well box and the other 12 wells were surveyed by Schack and <br /> Company, Inc for horizontal position and elevation relative to meat}sea level datum using the top of <br /> the fire hydrant at the southwest corner of Grant Line Road and Parker Avenue per the City of Tracy <br /> datum (Appendix D) <br /> 50 TRENCHING & EXTRACTION LINE INSTALLATION <br /> On October 28 through November 7, 1996, Kvaener Davy Aronson Engineering Inc (Aronson) <br /> excavated two trenches,set five well vaults, and extended the existing east-west running soil vapor <br /> extraction (SVE) and groundwater extraction (GWE) lines southward to the new vaults and wells <br /> (Figure 2) Three-foot-square by 3-foot-deep traffic-rated street vaults were installed to protect the two <br /> groundwater extraction wells, and at three other locations along the two 3-foot-deep trenches for <br /> installation of possible future SVE and GWE wells <br /> The following schedule 40 PVC lines were stubbed up into the five vaults at the site <br /> Line Diameter Description <br /> 2-inch Groundwater Extraction Line <br /> 1-inch Groundwater Pump Control Conduit <br /> 1-inch Groundwater Pump Power Conduit <br /> 2-inch Soil Vapor Extraction Line <br /> 2-inch Lateral Slotted Shallow Soil Vapor Extraction Line <br /> The two 2-inch-diameter pipes 1n each trench were coupled into the existing SVE and GWE lines The <br /> piping in the trench was laid on and covered with approximately 6 inches of gravel, followed by <br /> self-compacting sand slurry to approximately 6 inches below grade, followed by base course gravel <br /> and hot patch asphalt to match the existing grade The bottom of each vault was sealed with hydrated <br /> bentonite chips and Portland cement to approximately 2 to 2 5 feet BGS A sketch of the piping layout <br /> and cross section of the trench is included with the field notes in Appendix C <br /> 5 1 Soil Sampling and Field Observations <br /> Soil samples were collected at four locations S1, S2, S3, and S4, during trenching activities at depths <br /> of 1 and 5 feet BGS (Figure 2) The shallow soil samples were collected directly from the backhoe <br /> bucket by driving a 2-inch-diameter by 6-inch-long brass tube into a freshly exposed soil surface The <br /> deeper sal samples were collected from a hand auger hole using an impact sampler with a single <br /> 0231INST RPT(Stitt 5 1) <br /> FLUOR DANIEL GTI �5_ <br />