Laserfiche WebLink
Groundwater Extraction Well Installation Summary Report Page 5 <br /> The Southland Corporation 455 Grant Line Road Tracy Californsa December 6 1996 <br /> 60 ANALYTICAL RESULTS <br /> Table 2 summarizes the laboratory analytical results of soil samples collected from the soil borings on <br /> October 23, 1996,the trench soil samples collected on October 28 1996, and samples collected <br /> during previous site investigations <br /> Benzene and TPH-G concentrations ranged from below method detection limits in soil samples <br /> collected from GWE-2 at depths of 10 and 15 feet BGS, to 3 7 milligrams per kilogram (mg/kg) and <br /> 2,000 mg/kg, respectively, In GWE-3 at 5 feet BGS MTBE was not detected in any of the samples <br /> collected from the two extraction well borings <br /> Benzene and TPH-G In soil samples collected during trench excavation ranged from below method <br /> detection limits in samples collected at S-2, to 4 1 mg/kg and 2,800 mg/kg, respectively, at sample <br /> location S-3 at 5 feet BGS MTBE was detected in one sample, S-3 at 5 feet BGS, at a concentration of <br /> 7 4 mg/kg Copies of laboratory analyses reports and chain-of-custody manifests are included in <br /> Appendix E <br /> The influent water sample collected from the tank pit well, GWE-2, contained 1 0 micrograms per liter <br /> (ug/L) benzene and 340 ug/L TPH-G <br /> 7 D WASTE DISPOSAL <br /> On November 6, 1996, Aronson oversaw the loading and transportation of approximately 40 tons of soil <br /> generated from drilling and trenching activities to BFI s licensed Class III landfill located in Livermoore, <br /> California for disposal Copies of the Non-Hazardous Special Waste Manifests are included in <br /> Appendix F <br /> Purged groundwater from the two extraction wells and rinse water generated from steam cleaning was <br /> stored in DOT-approved 55-gallon drums and placed in the treatment compound pending disposal <br /> through the groundwater treatment system <br /> 80 SUMMARY AND STATUS <br /> In order to depress the water table and allow the use of soil vapor extraction at the subject site, two <br /> groundwater extraction wells GWE-2 and GWE-3 were drilled and installed at the site and a total of <br /> five well vaults connected with GWE and SVE lines were installed Three of the vaults were installed <br /> for potential future installation of additional wells One groundwater extraction pump was installed in <br /> GWE-2 and the system brought on line If the site can be dewatered using the tank pit well, soil vapor <br /> extraction will be used to remove hydrocarbons adsorbed to the soil It needed a second pump can be <br /> 0231tNST RAT(Sihi 5 1) <br /> FLUOR DANIEL GTI <br />