Laserfiche WebLink
Mr. Michael Kith <br /> May 11, 2017 <br /> be temporarily stored in DOT approved 55-gallon drums pending transport by Chevron's disposal <br /> contractor to an appropriate disposal or treatment facility. <br /> Reporting and Schedule <br /> Arcadis received a directive from Central Valley Regional Water Quality Control Board (RWQCB)to <br /> conduct routine monitoring and sampling or destroy the wells (Attachment 5; Central Valley Regional. <br /> Water Quality Control Board 2017). Arcadis is prepared to initiate well destruction activities after receipt of <br /> all necessary approvals and permits. A summary report describing well decommissioning activities will be <br /> submitted to RWQCB within 60 days of completing field activities. <br /> If you have any questions regarding the contents of this third work plan addendum, please contact <br /> Tamera Rogers at phone (408.797.2013) or email (Tamera.Rogers@arcadis.com). <br /> Sincerely, i <br /> Oi�kL GFO <br /> Arcadis U.S., Inc. Qom° MELISSA 1, <br /> BLANCHETTE <br /> No.oJ31 <br /> �P <br /> 9TFOF CAL1F0�� <br /> Tamera Rogers Melissa Blanchette, P.G. <br /> Project Manager Principal Geologist <br /> Copies: <br /> James Kiernan, EMC (electronic upload) <br /> Ed Ralston, Phillips 66 Company (electronic upload) <br /> Target Corporation, Target Property Development,Attn: Real Estate Portfolio Management/T- <br /> 2238/Stockton, CA—1000 Nicollet Mall, TPN-12H, Minneapolis, MN 55403 (with an additional copy via <br /> email to construction.environmental@target.com) <br /> Enclosures: <br /> Tables <br /> 1 Well Construction Details and Proposed Well Destruction Method <br /> Figures <br /> 2 Site Location map <br /> 3 Site Plan <br /> Attachments <br /> 1 SJCEHD Correspondence <br /> arcadis.com Page: <br /> 351515 170511-Well Destruction Work Plan Addendum 3.docx 3/4 <br />