Laserfiche WebLink
iViFY wJ'Ji4a. iJ/..Vii1V fi UirYJi._.. V JWV , <br /> f <br /> SITE FQACf S C• JOB iw) kvL NO <br /> SAMPLING DATE (4-2-5-b7 , by WEATHER: <br /> PURGE DATE _ If- 25• VT- --- . by &KA. �t C� <br /> WATER ELEVATION NOLUME CALCULATIONS <br /> Description of Measuring Point (MP): To C-, <br /> Total depth of well: ft . <br /> Depth (from MP) to Water: -7-±q ft Screen interval from ft to ft. <br /> Total Water depth: 1(c..7.5' ft Hydrocarbons present: Yes �. No <br /> Measurement method: Hydrocarbons thickness: <br /> PURGE VOLUME CALCULATION - <br /> Total <br /> ft nater a easing f r gal/casing vol. * volumes=T-2 gals purged. <br /> Casing Factor: Fa 2101:d = 0.17 gal/ft <br /> (circle one) Far " dia 0.38 gal/ft <br /> For A" dia = 0.66 gal/ft <br /> DRAWDOWN DETERMINATION <br /> Water level begin time: time pump on <br /> Water level and time: time pump off <br /> PURGING <br /> Time Cumulative <br /> Dischargek'�'2.21 <br /> Conductivity "C <br /> Start End (gal) umho/cm Turbidity Temp Comments <br /> 16 S 4—IF l a Hca <br /> 28$4 Zg S11 <br /> o d aF I <br /> Method of discharge disposal <br /> Method of purging/sampling <br /> Method of cleaning baile �.-- <br /> Pump lines/bailer ropes ex, cleaned or dedicated? (circle one) <br /> pH meter V& -calibrated_,T_ conductivity meter calibrated <br /> temp correct d? <br /> - 3 <br /> SAMPLES J <br /> Lab analyses to be performed <br /> Laboratory - <br /> . j <br /> i <br /> Remarks <br /> 3 <br /> i <br /> 2963alcavA14 <br />