Laserfiche WebLink
rvR.0 usi�n runv.4nv a ulsrara.ia�v a.uv <br /> sI�E '+&A l.f JOB ALL No <br /> SAMPLING DATE , by elmv- WEATHER: lfl - <br /> PURGE DATE , by (f U <br /> MATER ELEVATION/VOLUME CALCULATIONS <br /> Description of Measuring Point (MP): - <br /> Total depth of Well: - 3.R.97. ft <br /> Depth (from MP) to Water: r ft Screen interval from ft to ft. <br /> Total water depth: _ Ib.zI ft Hydrocarbons present: Yes No <br /> Measurement method: _ S o4;� Hydrocarbons thickness: <br /> PURGE VOLUME CALCULATION <br /> Total <br /> [,� ft Water * casing for -18Y gal/casing vol. * volumes=gals purged. <br /> Casing Factor: Forldia - 0.17 gal/ft <br /> :.(circle .qna):-. -For 3" din - 0.38 gal/ft <br /> For A" dia - 0.66 gal/ft <br /> DRAWDOWN DETERMINATION <br /> Water level begin time: time pump on <br /> Water level and time: time pump off <br /> PURGING <br /> Time cumulative <br /> Discharge Conductivity 'c <br /> Start End (gal) pH who/cm Turbidity Temp Comments <br /> g .Zs C) <br /> rZ o <br /> Method of discharge disposal 6 av_-%-A <br /> Method of purging/sampling ' <br /> Method of cleaning bailer/ <br /> Pump lines/bailer ropesdlY, cleaned or dedi tad? (circle one) <br /> pH meter cSa�ibrated,_� conductivity meter calibrated,_„_ <br /> tamp correc ed? Vi <br /> SAMPLES <br /> Lab analyses to performed 7F 1� TO7& L <br /> Laboratory R <br /> Remarks <br /> .2965&/ca,PA14 <br />