Laserfiche WebLink
+.• SITE le6CI SC- JOB { 3 S-S WELL NO _OLO- <br /> SAMPLING DA 205m , by r--PT. e!!j C>j WEATHER <br /> PURGE DATE , by e E <br /> WATER ELEVATIONNOLUME CALCULATIONS <br /> +- Description of Measuring Point (KP):_ )a& {„�...rlc.Cp _To C <br /> i 0 SO Depth (from MP) to Water: Q ' ft Screen interval from 5 ft�to „S ft, <br /> Total water depth: - = ft Hydrocarbons present: Yas No <br /> �. Measurement method: 5- i-11145r Hydrocarbons thickness: <br /> PURGE VOLUME CALCULATION ;L 7�, q <br /> I Total <br /> ft water * casing factor - * al/casiak vol. *3 volumes- gals purged. <br /> Casing Factor: For 2” dia 0. 6 a � y z <br /> �., (circle one) For- 3" dia - 0.37 gal/ft rt. 17.f <br /> For 4" dia - 0.65 gal/ft p <br /> 2 !7 <br /> DRAWDOWN DETERMINATION 1 z7gY <br /> Water level �egin time: time pump on <br /> �. Water level end time: time pump off <br /> 1- <br /> PURGING <br /> Time Cumulative <br /> Discharge Conductivity <br /> Start End (gal) pH pmho/cm Turbidity Comments J F <br /> c,2- V., , 50t> .3 <br /> /o o0 <br /> ., <br /> 13q5' Z7/0 =- o <br /> Method of discharge disposal L) <br /> Method of sampling/purging 1� r c a� <br /> Method of cleaning bailer/pump: A I czylv-._o <br /> Pump lines/bailer ropes new, cleaned or dedicated? (circle one) <br /> 'W pH meter calibrated -conductivity meter calibrated_` e S <br /> temp corrected? , O _ I <br /> 4 <br /> SAMPLES 1(r h ,. <br /> Lab analyses to be performed r , T-CX -FP14z DCt4 '� L <br /> Laboratory <br /> Remarks �� <br />