Laserfiche WebLink
i <br /> ENVIRONMENTAL HEALTH EPAR <br /> TMENT <br /> OP�u'N c <br /> SAN JOAQUIN COUNTY <br /> '< Donna K. Heran, R.E.H.S. Program Coordinators <br /> Director 304 East Weber Avenue,Third Floor Carl Borguman, R.E.H.S. <br /> �. Laurie A. Cotulla,R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S.,R.D.I. <br /> cQ IF0=Ra`P Assistant Director Telephone: (209)468-3420 Margaret Lagorio, R.E.H.S. <br /> Robert McClellon, R.E.H.S. <br /> Fax: (209)464-0138 Jeff Carruesco, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Kasey Folex R.E.H.S. <br /> SATMAN SINGH ETAL <br /> GET-N-GO MART <br /> 574 W GRANT LINE RD <br /> TRACY CA 95376 <br /> RE: UNOCAL SERVICE(FORMER SCOTTY'S) SITE CODE: 1405 <br /> 574 W GRANT LINE RD <br /> TRACY CA <br /> WORKPLAN: Ozone Sys—RQpair. <br /> DATED: Janua 30,2007 <br /> PREPARED BY: Aqua Science Engineers,Inc. <br /> APPROVED X <br /> DISAPPROVED 11 <br /> ADDENDUM ❑ Submit by <br /> I <br /> I <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN(H&S 25299.37,subd.(c)(3).): ; <br /> 1. To repair the tubing and fitting on 10 ozone-sparge wells located on-site in the area of the <br /> groundwater contamination plume caused by the former USTs. ! <br /> 2. To recondition the C-Sparge system generator and panel manufactured by KVA Assoicates. <br /> 3. To modify the C-Sparge system as needed. <br /> 4. To restart the C-Sparge system after repairs for continuous operation. <br /> 5. To perform required operation and maintenance of the C-Sparge system and continue with <br /> groundwater remediation as required. <br /> COMMENTS AND CONDITIONS: <br /> 1. You are required to notify San Joaquin County EHD Unit III of your intensions. EHD Unit III <br /> regulates active UST systems and may required UST system testing after trenching and <br /> compaction of the affected piping runs. <br /> 2. You are required to notify EHD Unit IV/LOP staff to schedule inspections during trenching <br /> and well modification repairs. i <br /> 3. Remediation reports will be required until site closure is granted with not further action 1 <br /> required. <br /> 4. Quarterly Groundwater monitoring, sampling,and reporting must continue until site closure is <br /> granted with not further action required. <br /> DATED r t BY l� <br /> Cc: SWRCB-Cleanup Fund <br /> Ramesh&Promila Sood <br /> Aqua Science Engineers,Inc. <br /> } <br /> t <br />