My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
3500 - Local Oversight Program
>
PR0545205
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 3:13:33 PM
Creation date
1/27/2020 3:02:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545205
PE
3528
FACILITY_ID
FA0003164
FACILITY_NAME
NORTH POLE GAS & FOOD INC
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E7 Napo, N-4101 <br /> Get-N-Go Mart -2- May 29, 2002 <br /> Claim No. 013850 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre-Approved Comments <br /> 1 Installation of 10 Ozone Sparge $11,635 <br /> Wells <br /> 2 Installation of System $53,505 Power supply costs totaling$1,000 <br /> to be evaluated at time of <br /> reimbursement. Costs totaling <br /> $450 for miscellaneous fittings, <br /> gauges, and plumbing parts <br /> evaluated at time of <br /> reimbursement. <br /> 3 Operation and Maintenance (First $2,220 <br /> Week <br /> 4 Operation and Maintenance (6 $24,540 Senior Geologist labor hours(24 <br /> Months) hours)not necessary since there is <br /> an overlap in responsibilties <br /> between the Senior Geologist and <br /> Senior Engineer. <br /> 5 1 System Installation Reporting $2,150 <br /> TOTAL PRE-APPROVED $94,050 <br /> * Task descriptions are the same as those identified in Aqua Science Engineers May 1,2002 cost estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. However, if costs exceed the above <br /> pre-approved amounts, the Fund will be unable to expedite your Reimbursement Request. Y <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Aqua Science Engineers, Inc. proposal in my pre-approval <br /> above, please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. This letter pre-approves the <br /> costs as presented in the proposal dated May 1, 2002 by Aqua Science Engineers, Inc. for <br /> conducting the work approved by the County for implementing the March 26, 2002, Aqua <br /> Science Engineers, Inc. workplan. <br /> California EB vironmental Protection Agency <br /> Q'*RwydedPeper <br />
The URL can be used to link to this page
Your browser does not support the video tag.