Laserfiche WebLink
AQUA SCIENCE ENGINEERS <br /> • WELL SAMPLING FIELD LOG <br /> PROJECT NAME <br /> JOB NUMBER DATE OF SAMPLING _6 <br /> WELL ID r SAMPLER <br /> TOTAL DEPTH OF WELL WELL DIAMETER <br /> DEPTH TO WATER PRIOR TO PURGING <br /> PRODUCT THICKNESS <br /> DEPTH OF WELL CASING IN WATER <br /> NUMBER OF GALLONS PER WELL CASING VOLUME <br /> NUMBER OF WELL CASING VOLUMES TO BE REMOVE 3 <br /> -REQUIRED VOLUME OF GROUNDWATER TO BE PURGED PRIOR TO SAMPLING <br /> EQUIPMENT USED TO PURGE WELL disposable bailer <br /> TIME EVACUATION STARTED : Icy TIME EVACUATION COMPLETED <br /> TIME SAMPLES WERE COLLECTED <br /> DID WELL GO DRY AFTER HOW MANY GALLONS ,2 <br /> GLUME OF GROUNDWATER PURGED s <br /> SAMPLING DEVICE dis osable bailer <br /> f <br /> SAMPLE COLOR ODOR/SEDIMENT <br /> CHEMICAL DATA <br /> VOLUME PURGED TEMPERATURE PH CONDUCTIVITY <br /> 1 —7, c <br /> z d0� l <br /> 3 —k, T <br /> SAMPLES COLLECTED <br /> SAMPLE # OF CONTAINERS SIZE AND TYPE OF CONTAINEF ANALYSIS PRESERVED <br /> 5 40ml VOA Y <br />